My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-32 APPROVING EXPENDITURE OF CITY FUNDS
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-32 APPROVING EXPENDITURE OF CITY FUNDS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2015 3:37:48 PM
Creation date
8/21/2015 3:37:45 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-32
Res Ord Title
APPROVING EXPENDITURE OF CITY FUNDS FOR THE EMERGENCY REPAIR OF WATER MAIN ON BALTIMORE AVENUE AT BIG CREEK
Department
Public Works
Approved Date
2/21/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIPMENT EXPENSE TOTAL EQUIP. AMOUNT <br /> DATE DESCRIPTION HOURS RATE <br /> 01/30/12 50,000 Ib. GVW Tandem Dump#4 - 33.20 - <br /> 50,000 Ib. GVW Tandem Dump#7 8.00 33.20 265.60 <br /> 25T Lowboy 6.00 41.30 247.80 <br /> 18,000 Ib. GVW Service Truck#6 - 21.10 - <br /> 18,000 Ib. GVW Service Truck#3 8.00 21.10 168.80 <br /> 143 HP Excavator on Track 8.00 71.94 575.52 <br /> (1.25 Cu. Yd. Bucket) <br /> 95 HP Loader Backhoe - 39.00 - <br /> 129 HP Cat. Rubber Tire Loader - 61.20 - <br /> i <br /> 01131/12 50,000 Ib. GVW Tandem Dump#4 - 33.20 - <br /> 50,000 Ib. GVW Tandem Dump#7 11.00 33.20 365.20 <br /> 25T Lowboy 4.00 41.30 165.20 <br /> 18,000 Ib. GVW Service Truck#6 - 21.10 - <br /> 18,000 Ib. GVW Service Truck#3 11.00 21.10 232.10 <br /> 143 HP Excavator on Track 11.00 71.94 791.34 <br /> (1.25 Cu. Yd. Bucket) <br /> 95 HP Loader Backhoe - 39.00 - <br /> 129 HP Cat.Rubber Tire Loader - 61.20 - <br /> 300 Sq. Ft. Trench Box per Day#1 1.00 150.00 150.00 <br /> Traffic Control per Day - 65.00 - <br /> 2"Trash Pump per Day 1.00 95.00 95.00 <br /> Steel Sheeting per Day 1.00 50.00 50.00 <br /> 02/01/12 50,000 Ib. GVW Tandem Dump#4 - 33.20 - <br /> 50,000 Ib. GVW Tandem Dump#7 8.00 33.20 265.60 <br /> 25T Lowboy 2.00 41.30 82.60 <br /> 18,000 Ib. GVW Service Truck#6 - 21.10 - <br /> 18,000 Ib. GVW Service Truck#3 8.00 21.10 168.80 <br /> 143 HP Excavator on Track 8.00 71.94 575.52 <br /> (1.25 Cu. Yd. Bucket) <br /> 95 HP Loader Backhoe - 39.00 - <br /> 129 HP Cat. Rubber Tire Loader - 61.20 - <br /> 300 Sq. Ft.Trench Box per Day#1 1.00 150.00 150.00 <br /> Traffic Control per Day - 65.00 - <br /> 2"Trash Pump per Day 1.00 95.00 95.00 <br /> Steel Sheeting per Day 1.00 50.00 50.00 <br /> 02/02/12 50,000 Ib. GVW Tandem Dump#4 - 33.20 - <br /> 50,000 Ib. GVW Tandem Dump#7 6.00 33.20 199.20 <br /> 25T Lowboy 6.00 41.30 247.80 <br /> 18,000 Ib. GVW Service Truck#6 - 21.10 - <br /> 18,000 Ib. GVW Service Truck#3 6.00 21.10 126.60 <br /> 143 HP Excavator on Track - 71.94 - <br /> (1.25 Cu. Yd. Bucket) <br /> 95 HP Loader Backhoe - 39.00 - <br /> 129 HP Cat. Rubber Tire Loader 6.00 61.20 367.20 <br /> I <br /> !TOTAL EQUPMENT EXPENSE 5,434.88 <br /> PAGE 2 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.