URS <br /> January 23, 2012 <br /> Mr. Matt Newell <br /> City Engineer <br /> City of Decatur <br /> One Gary K. Anderson Plaza <br /> Decatur, Illinois 62523-1196 <br /> Re: Prefinal Plans (1) <br /> South Shores Drive over Sand Creek Arm of Lake Decatur <br /> Section 09-00905-00-BR <br /> City Project No. 2009-05 <br /> Dear Matt, <br /> Enclosed for your review is one (1) set of prefinal plans, special provisions, estimate of time and <br /> estimate of cost for the subject project. The Storm Water Pollution Prevention Plan (SWPPP) is <br /> included in the Special Provisions and requires your signature. I have provided an additional <br /> copy that you can return to URS. <br /> The current estimate of time shows 155 working days. We have assumed that all of the sewer <br /> work will be done prior to any other work. Forty-five working days are estimated to complete <br /> the sanitary sewer work and supporting structures. <br /> The total estimated cost is $3,076,795.40. The current estimated cost for the sewer related items <br /> is $525,765.20. <br /> Bruce Bird has reviewed a copy of the plan and profile sheet and said that he has no problems <br /> with the proposed work. He told me that members of his staff had informed him that the existing <br /> 18" concrete storm sewer, located in front of the Caceres, Schwieger and Hinton properties, was <br /> paid for by the local residents so that they would not have deep ditches in front of their <br /> properties. It is not known if the current residents contributed to that work. Due to the amount <br /> that the roadway is being raised, the current plan is to remove the 18" storm sewer and replace <br /> with a ditch in that area. This may come up during right-of-way negotiations although Mrs. <br /> Caceres did not mention this nor did anyone at the public meetings. <br /> URS Corporation <br /> 345 E.Ash Avenue <br /> Suite B <br /> Decatur, IL 62526 1 <br /> Tel: 217.875.4800 <br /> Fax: 217.875.3577 <br />