Laserfiche WebLink
TIRS <br /> 7) After evaluating the boring logs, the URS geotechnical group became involved in the <br /> substructure design of the pier for the roadway bridge and the piers for the sewer pipe <br /> due to pile/pier embedment issues and settlement concerns. <br /> 8) After Monte Cherry commented on the need for some type of aesthetic treatment, hours <br /> were used to investigate options to hide the pipe on the pipe bridge even though this task <br /> was not in our scope. <br /> Please feel free to call if you have any questions. <br /> Sincerely, <br /> URS Corporation <br /> i�� Z/ '4 <br /> Keith W. Benting, P.E., S.E. <br /> Project Manager <br /> KWB/kwb <br /> Enclosure <br /> 36432849.00100 <br /> S:A36432849\Communications\letters\Prefinal Plans-Ldoc <br /> 3 <br />