Street Light Order <br /> This street light order will purchase the following: <br /> 39- 12' Pedestrian Street lights. See Fixture A on Figure 1. These lights are currently being <br /> installed on Water Street. As part of the Main Street project they will be used primarily <br /> on Prairie Avenue with some on Main Street to supplement the larger 30 street lights <br /> being installed. This order will include 5 spare lights to be used for maintenance <br /> purposes. <br /> 14- Lighted Bollards. See Fixture B on Figure 1. These bollards match the street lights and are <br /> used primarily in and around the small parking lots at Main and Main. This order will <br /> include 3 spare lighted bollards to be used for maintenance purposes. <br /> 5- 30' Street Lights. See Fixture C on Figure 1. These lights are similar to the lights on <br /> Eldorado and on North Street. The tall overhead lights are the main light being installed <br /> on Main, Franklin, and other side streets as part of the streetscape work. The lights being <br /> installed with the project are being provided by the contractor. These lights are to be <br /> used as spares for maintenance purposes. <br /> 16- 22' Pedestrian Street Lights. See Fixture E on Figure 1. These lights are to be placed on <br /> Merchant Street. They utilize a steel pole that adds strength, along with added height, to <br /> allow a cable with LED lights to extend between the poles. This order will include 2 <br /> spare lights to be used for maintenance purposes. <br /> Future street light purchases will be proposed as design work progresses and as quantities are <br /> confirmed for Central Park, which will include North and South Park Streets, and for the <br /> Franklin Street corridor. <br /> POTENTIAL OBJECTION: There are no known objections to this resolution. <br /> INPUT FROM OTHER SOURCES: Massie Massie and Associates <br /> STAFF REFERENCE: Richard G. Marley, Public Works Director and Matt Newell, City <br /> Engineer. Richard Marley will be in attendance at the City Council meeting to answer any <br /> questions of the Council on this item. <br /> BUDGEU/TIME IMPLICATIONS: <br /> Budget Impact: Funding for this work is allocated as part of the General Obligation Bonds <br /> authorized by the City Council on November 15, 2010. The Resolution authorizes the <br /> expenditure of$243,713.28 to purchase street lights for the Main Street Streetscape project. <br /> Staffmg Impact: Staff time has been allocated for managing the downtown streetscape work. <br /> This Memorandum was prepared by Matthew C. Newell, P.E., City Engineer. <br /> Attach: 3 <br /> cc: Bob Dozier, Philip McCully&Associates, Inc. <br /> Page 2 <br />