My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-05 AUTHORIZING AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-05 AUTHORIZING AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2015 8:51:43 AM
Creation date
8/24/2015 8:51:41 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-05
Res Ord Title
AUTHORIZING AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
Department
Water
Approved Date
2/6/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit C <br /> ID Task Name March 2012 A r <br /> 21 24 1 27 1 1 4 1 7 10 113 16 19 22 25 28 31 <br /> 1 Q 1. Apply existing research by state and federal agencies <br /> characteristics and performance of fish barrier concepts <br /> at the Lake Decatur dam. <br /> 2 0 a.)Investigate opportunities with state and federal agenc <br /> potential for construction of a pilot project at the Lake De, <br /> 3 0 b.)Contact state and federal agencies doing the Asian C <br /> into the Decatur project for both technical input and poss <br /> 4 0 2. Investigate known swim characteristics of the Asian C <br /> and flow characteristics of the dam at various flood stage <br /> evaluate the potential for the carp to migrate upstream,o <br /> 5 Q a.)A summary of tailwater and pool conditions for the m, <br /> will be created for a range of flows. <br /> 6 3. Investigate options for construction of a barrier simmV <br /> at the Lake Decatur dam. Options will be evaluated f <br /> disadvantages,and a preliminary budget cost for coi <br /> will be developed. <br /> 7 Q a.)A secondary rock dam below the sluice gate wow <br /> to control the carp while still able to pass the sluice <br /> 8 0 b.)A physical barrier structure below the bascule g <br /> 9 Q c.)Modifications to the existing sluice gate trash raAW <br /> 10 d.)Physical,chemical,or electrical barrier below th <br /> 11 0 e.)Coordinate with the Client to discuss preferred — <br /> 12 4. Prepare draft report to include findings of study effort <br /> 1�Q a.)Submit draft report for review and comment by the C <br /> 14 b.)Meeting with the Client to discuss review comments. <br /> i <br /> 15 Q c.)Submit three copies of the final report to the Client. <br /> 16 5. Project Management <br /> i <br /> Project:projectschedule1 Task ft• <br /> Date:Tue 12/6/11 Split <br /> 11 L0142 Asian Carp schedule1.mpp <br /> Tue 12/6/11 9:09 AM ht <br />
The URL can be used to link to this page
Your browser does not support the video tag.