My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-05 AUTHORIZING AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-05 AUTHORIZING AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2015 8:51:43 AM
Creation date
8/24/2015 8:51:41 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-05
Res Ord Title
AUTHORIZING AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
Department
Water
Approved Date
2/6/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Consulting Engineer expressly acknowledges,recognizes and agrees that the only authority to <br /> approve change orders to this Agreement or the Scope or Services or the cost(s)therein is with the <br /> City Council of the City. <br /> SECTION II. BASIC SERVICES <br /> A. STUDY AND REPORT PHASE. <br /> The Consulting Engineer shall: <br /> 1. City's Requirements. Review available data and consult with the City's Representative to clarify <br /> and define the City's requirements for the Project. <br /> 2. Advise Regarding Additional Data. Advise the City's Representative as to the necessity of the <br /> City's providing or obtaining from others data or services of the types described in Section V(C) <br /> in order to evaluate or complete the Project,and act as the City's representative in connection <br /> with any such services. <br /> 3. Technical Analysis. Provide analysis of the City's needs,planning surveys, site evaluations, and <br /> comparative studies of prospective sites and solutions. <br /> 4. Economic Analysis. Provide a general economic analysis of the City's requirements applicable to <br /> various alternatives in accordance with economic parameters and assumptions provided by the <br /> City's Representative. <br /> 5. Report Preparation. Prepare a report("Study Report")containing schematic layouts, sketches and <br /> conceptual design criteria with appropriate exhibits to indicate clearly the considerations involved <br /> and the alternative solutions available to the City of Decatur. The Study Report shall also set <br /> forth the Consulting Engineer's findings and recommendations with opinions of probable costs <br /> for the Project, including construction cost, contingencies, allewanees-for-ehar-ges of au <br /> professionals and eensuhapAs, allowanees for-the eest of la*d and rights of way, allowanees <br /> (all of which are hereinafter called"Project Costs"). <br /> Specific requirements for the Study Report are included in Exhibit A, Scope of Services. <br /> 6. Report Presentation. Furnish paper copies and digital copies of the Study Report in the number <br /> and format specified in Exhibit A, Scope of Work, and present and review the Study Report in <br /> person with the City as the City's Representative shall direct. The cost of reproduction of the <br /> Study Report shall be considered a reimbursable expense and paid in accordance with Section <br /> V(C)of this Agreement. <br /> 7. Completion Time. The Study Report shall be completed, submitted and accepted by the City's <br /> Representative within the time period set forth in Exhibit C,Project Timeline. <br /> B. PRELIMINARY DESIGN PHASE. Not Used <br /> C. FINAL DESIGN PHASE. Not used <br /> D. BIDDING PHASE. Not used <br /> E. CONSTRUCTION SURVEY AND LAYOUT PHASE. Not used <br />
The URL can be used to link to this page
Your browser does not support the video tag.