My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-81 REZONING PROPERTY - 1312 NORTH WATER STREET
COD
>
City Clerk
>
ORDINANCES
>
2012
>
2012-81 REZONING PROPERTY - 1312 NORTH WATER STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2015 9:49:43 AM
Creation date
8/24/2015 9:48:39 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2012-81
Res Ord Title
REZONING PROPERTY - 1312 NORTH WATER STREET
Department
Development Services
Approved Date
11/5/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
District Serial No. <br /> SPECIAL PROVISIONS <br /> for <br /> DETENTION BASIN OUTLET <br /> USE OF DRAINAGE FACILITIES — In granting this permit, it is understood that the uses of drainage facilities <br /> of any nature are to comply with the requirements of the state laws, local ordinances and the regulations of the <br /> Illinois Environmental Protection Agency, Division of Water Pollution Control. No person, firm, corporation, or <br /> institution, public or private, shall discharge or empty any type of sewage, including the effluent from septic <br /> tanks or other sewage treatment devices, or any other domestic, commercial or industrial waste, or putrescible <br /> liquids, or cause the same to be discharged or emptied in any manner into open ditches along any public street <br /> or highway, or into any drain or drainage structure installed solely for street or highway drainage purposes. <br /> MAINTENANCE— It is understood and agreed that the Applicant, his successors and assigns shall construct <br /> and maintain that portion of the detention basin outlet on State right-of-way in a manner satisfactory to the <br /> Department. <br /> TRAFFIC CONTROL—Whenever any of the work under this permit involves any obstruction or hazard to the <br /> free flow of traffic in the normal traffic lanes, plans for the proposed method of traffic control must be submitted <br /> to and approved by the District Engineer at least 72 hours, and preferably longer, before the start of work. <br /> All traffic control shall be in accordance with the State of Illinois Manual on Uniform Traffic Control Devices and <br /> amendments thereof. It should be noted that standard and typical placement of devices shown in the Uniform <br /> Manual are minimums. Many locations may require additional or supplemental devices. <br /> The state of Illinois, through its representative, reserve the right to stop work on this project anytime it is <br /> determined that requirements of the permit are being violated. <br /> SEEDING REQUIREMENTS — TheApplicant-will-fertilize ,seed and <br /> quantities are as follows: straw the slopes that are damaged. The <br /> Seed: Sarins Fall <br /> Ky. Bluegrass 50 lbs. 50 lbs. <br /> Perennial Ryegrass 20 20 <br /> Redtop or Creeping Red Fescue 10 10 <br /> Ladino or White Dutch Clover 5 0 <br /> Oats, Spring 0 48 <br /> Fertilizer: 10-6-4 800 lbs. Per acre <br /> Straw: 2 tons per acre <br /> All waste materials and debris shall be removed from state highway right-of-way. <br /> 10 of 13 <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.