My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-82 AMENDING ZONING ORDINANCE - WIND ENERGY SYSTEMS
COD
>
City Clerk
>
ORDINANCES
>
2009
>
2009-82 AMENDING ZONING ORDINANCE - WIND ENERGY SYSTEMS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2015 10:18:21 AM
Creation date
8/28/2015 10:18:18 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2009-82
Res Ord Title
AMENDING ZONING ORDINANCE - WIND ENERGY SYSTEMS
Approved Date
11/16/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. A plan for decommissioning and reclaiming the wind energy system, <br /> and a bond for doing so in an amount not less than one half the cost of <br /> constructing the wind energy stem. <br /> 8. Any and all other pertinent information regarding the installation, <br /> construction and operation of the wind energsystem. <br /> D. REVIEW AND APPROVAL <br /> 1. Technical Review Committee. <br /> The Technical Review Committee (TRC) shall review the site plan at a date <br /> scheduled by the Secretary of the TRC. The applicant and his/her design <br /> professionals may participate in this meeting. Based upon the information <br /> provided by the applicant, the TRC may recommend approval, conditional <br /> approval, or denial to the Plan Commission. The recommendation of the TRC will <br /> be compiled into draft conditions of approval. If the TRC determines that more <br /> information is needed before the application can be approved, they may place the <br /> qpplication on hold, in which case the TRC will advise the applicant as to the <br /> contents which will be required before approval can be recommended. <br /> Applications placed on hold will be rescheduled to the next meeting of the TRC <br /> unless the applicant requests more time. <br /> 2. Plan Commission Review. <br /> After the Wind Energy System Permit application and site plan have been filed, <br /> said application, site plan, and draft conditions of approval will be considered by <br /> the Plan Commission at a public hearing. The Plan Commission will review the <br /> application, site plan, and draft conditions of approval and will make findings <br /> concerning the consistency of the application with the comprehensive plan, and <br /> with the zoning ordinance and other land development regulations if appropriate, <br /> and, based upon these findings, will recommend to the City Council that the <br /> project be approved, approved with conditions, or denied. <br /> 3. Council Action. <br /> City Council will review the recommended findings of the Plan Commission <br /> along with the application, site plan, and draft conditions of approval, and the <br /> project may be gpproved, approved with conditions, or denied. The City Council <br /> may by ordinance grant a Wind Energy System Permit. The Council may impose <br /> appropriate conditions and safeguards to conserve and protect property values. <br /> E. CONSTRUCTION <br /> 1. All construction shall be in conformance with the final Wind Energy <br /> System site plan as approved by the City Council. <br /> F. DELAY IN CONSTRUCTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.