Laserfiche WebLink
FORCE ACCOUNT ESTIMATE <br /> Work to be Performed By: Norfolk Southern Railway Company <br /> For the Account of: City of Decatur,Illinois <br /> Project Description: Brush College Rd Crossing Study <br /> Location: Decatur Illinois-Brush College Rd <br /> Project No.: NONE <br /> Milepost: D-372.9 <br /> Date: 11/15.2011 <br /> File: BR0020452 <br /> SUMMARY <br /> ITEM A-Preliminary Engineering 21,500 <br /> ITEM B-Construction Engineering 0 <br /> ITEM C-Accounting 2,600 <br /> ITEM D-Flagging Services 2,745 <br /> ITEM E-Conununications Changes 0 <br /> ITEM F - Signal&Electrical Changes 0 <br /> ITEM G-Track Work 0 <br /> ITEM H-T-Cubed 0 <br /> GRAND TOTAL $ 26,845 <br /> ITEM A-Preliminary Engincerin� <br /> (Review plans and special provisions, <br /> prepare estimates, etc.) <br /> Labor: 60 Hours @ $100/hour= 6,000 <br /> Travel Expenses: 1,500 <br /> Services by Contract Engineer 14,000 <br /> NET TOTAL-ITEM A $ 21,500 <br />