My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-166 APPROVING CHANGE ORDER 2
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-166 APPROVING CHANGE ORDER 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 1:50:08 PM
Creation date
8/31/2015 1:50:08 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-166
Res Ord Title
APPROVING CHANGE ORDER 2 TO AGREEMENT WITH PHILLIP W. COCHRAN, P.E., CONSULTING ENGINEER FOR CONSTRUCTION ENGINEERING SERVICES FOR WATER STREET STREETSCAPE ENHANCEMENT - PHASE 2
Approved Date
10/17/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUKphillip w. cochran • consulting engineer <br /> October 6, 2011 <br /> Mr. Matt Newell <br /> City Engineer <br /> City of Decatur <br /> #1 Gary K. Anderson Plaza <br /> Decatur, IL 62523 <br /> Subject: Construction Engineering Services Proposal <br /> North Water Streetscape Enhancement <br /> Project Phase II <br /> City Project: 2011-14 <br /> PWC Project: 11005 <br /> Dear Matt: <br /> In accordance with your request I am pleased to submit the following proposal for <br /> Additional Professional Engineering Services for the subject City Project. As discussed <br /> our existing Engineering Services contract did not include any services after the award <br /> of the construction contract to the contractor. These additional services are for the <br /> following construction engineering services for the Phase II project only. <br /> PWC AGREES <br /> 1. To provide the following construction engineering services and assistance to <br /> the City of Decatur during the construction phase of the inn prove ments for the <br /> Phase II North Water Streetscape Enhancement Project: <br /> A. To assist the City of Decatur with answering contractor's questions which <br /> may arise during the construction of the improvements. These questions <br /> could be construction detail questions or design related questions. <br /> B. To make site visits if requested <br /> C. To review shop drawings, material submittals, equipment list submittals, <br /> etc. <br /> D. To provide survey services if requested. Said survey services would <br /> include checking contractor's layout, control point replacement or other <br /> quality control type issues. <br /> 5130 hickory point frontage road • suite 2 • decatur, illinois 62526 • phone (217) 875-3333 • fax (217) 875-3371 <br />
The URL can be used to link to this page
Your browser does not support the video tag.