My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-156 APPROVING EXPENDITURE
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-156 APPROVING EXPENDITURE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 2:37:47 PM
Creation date
8/31/2015 2:37:46 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-156
Res Ord Title
APPROVING EXPENDITURE FOR PAVEMENT WIDENING ON LAKE SHORE DRIVE EAST OF NELSON PARK
Department
Public Works
Approved Date
10/3/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OTTO BAUM wwwottobaum.com <br /> 217-8764000 a Fax 2I <br /> -COMPAW, INC. 17- 4014 <br /> 1788 Hubbard A 8 v De atur,ISL.62526 <br /> Ed CONTRACTORS MASONRY conlcRIM EARTHWORK a SM/CML or PX5MRATloty <br /> • I <br /> Date: September 8,2011 QUOTATION and AGREEMENT <br /> To: City of Decatur We hereby propose to furnish the foilowing scope <br /> "#I-Gary K,Anderson Plaza ._._._. .. .-.-- :..._ _ .__.. .. .. ....-_ _•of work-for the-sum.of:. <br /> becatur, IL 62522 See Below <br /> Attn: Kevin Meachum <br /> Pr9iect. Lake shore Drive @ Nelson Park Mei due ao days from biding dace.)_ <br /> Name: <br /> Kevin: <br /> We have looked at your request to install approximately i76 square yards of concrete to the waterside <br /> of the existing roadway to create an area for tum-arounds. This location is near the Decatur Park Districts <br /> closure gates. The scope of work is as follows: <br /> Saw cut along existing pavement to create smooth edge. <br /> Remove approximately 3-4 inches of existing aggregate(this can be wasted along the existing shoulders.) <br /> Existing grade is approximately 2-3 inches lower than roadway. <br /> Provide and finish 6 inch concrete(non-reinforced) <br /> Broom finish and saw joints <br /> Our price is: $10,895.00. <br /> Should you want OBCI to remove existing concrete bumper blocks and reinstall on top of new <br /> pavement(pinned down),—add$1,050.00. <br /> We are in a position to complete this work after the 48 hour JULIE requirement. <br /> Contractor's Guarantee Acceptance of Quotation <br /> We guarantee all material in this contract to be as specified above and The above specifications,terns and contract are satisfactory,and(1)(we) <br /> the entire Job to be completed in a neat and workmanlike manner.Any hereby authorize performance of this work <br /> variations from the plan or alterations requiring extra labor or material will <br /> be performed only upon written order and tailed in addition to the sum / <br /> covered by the contract. Agreements made wfth our workman are not <br /> recognized.This quote is valid for 30 days. Date: If <br /> Signed: <br /> Signed: ( Title: . <br /> col <br /> Attest: /e <br /> Celeste F. Harris; C' y Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.