Laserfiche WebLink
Project Name: Concrete Street Reconstruction,L&A Industrial Drive <br /> Engineer's Estimate Otto Baum Company,Inc. Kinney Contractors,Inc. Feutz Contractors,Inc. Mid-States General& Dunn Company G.M.Sipes Construction,Inc. Sangamo Construction Co. <br /> Project Number: 2011-11,Section No.11-00111-00-RP 1788 Hubbard Ave. 19342 E.Frontage Rd. 1120 N.Main St. Mechanical Contracting 724 N.Mercer Street 503 E.Adams St. 2100 E.Moffat Ave. <br /> Decatur,IL 62526 Raymond,IL 62560 PO Box 130 Corp. Decatur,IL 62522 PO Box 109 Springfield,IL 62702 <br /> City Engineering Division Paris,IL 61944 4170 N.Bearsdale Rd. Rushville,IL 62681 <br /> Bid Date: Wednesday,August 17,2011 217-876-1000 217-229-3322 217-465-8402 Decatur,IL 62526 217-4294444 217-544-9871 <br /> 217-322-6643 ext.26 <br /> Time: 10:00 A.M. donallen(a)ottobaum.com kinnev(olroadbuilder net biCilfeutzcontractors.com 217-875-1260 liooltd(codunnco corn cmeland 5sanaamo.net <br /> rm u Ider(ftrnsi aes.corn <br /> Fund: Motor Fuel Tax ar.sebens midstatescontractin .co <br /> Organization Code: 46484606 <br /> Object Code: 489070 <br /> Item Number Pay Item QTY Unit Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total <br /> 30201500 LIME 4 TON $75.60 $3,628.80 $103.00 $4,944.0 $100.00 $4,8000 $90.00 $4,320.0 $105.00 $5,040.0 $95.00 $4,560.0 $95.00 $4,560 $100.50 $4,824.00 <br /> 30200350 PROCESSING MODIFIED SOIL 8 INCH 3,577 SY $3.25 $11,625.2 $5.50 $19,673.50 $4.70 $16,811. $4.25 $15,202.25 $550 $19,673.5 $450 $16,096.50 $4.50 $16,096.5 $8.97 $32,085.6 <br /> 40201000 AGGREGATE-TEMP ACCESS 12 TON $36.00 $4.32000 $41.00 $4.920.0 $30.00 $3,600.0 $2400 $2,880.0 $3700 $4,440.00 $27.50 $3,300.0 $3500 $4,200.00 $38.43 $4,611.6 <br /> 4240020 PC GONG SIDEWALK 5 400 SF $4.50 $1,800.00 $10.00 $4,000.00 $6.00 $2,400.00 $8.50 $3,400.00 $900 $3,600.00 $11.30 $4,520.00 $1500 $6,000.0 $12.32 $4,928.00 <br /> 42400800 DETECTABLE WARNINGS 161 SF 1 $37.001 $592.00 $41.00 $65600 $35.001 $560.00 $15.001 $240.00 $37.001 $592.0 $45301 $724.8 $50.001 $800. $22.76 $364.1 <br /> [60604400 <br /> 4000100 PAVEMENT REMOVAL 3,577 SY $2400 $85,848.0 $13.00 $46,501.00 $14.00 $50,078.0 $14.10 $50,435.7 $9.00 $32,193.0 $16.60 $59,378.2 $15.00 $53,655.0 $1848 $66,102.96 <br /> 4000500 COMB CURB AND GUTTER REMOVAL 12 FOOT $5.00 $60.0 $80.00 $960.0 $12.00 $144.00 $10.00 $120 $33.00 $396.00 $11 05 $132.6 $15.00 $180.0 $59.94 $719.2 <br /> COMB CONC CURB AND GUTTER TYPE B 12 FOOT $35.00 $4200 $100.00 $1,200.00 $45.00 $540 $41.00 $492.0 $75.00 $9000 $84.00 $1,008.00 $75.00 $900.0 $71.50 $858.00101800 TRAFFIC CONTROL SPECIAL 1 LS $10,000.00 $10,000. $4.200.00 $4,200.00 $8,300.00 $8,300. $8,20000 $15,000.00 $15,000.0 $6,10500 $6,105.0 $25,000.00 $25,000.00 $8,095.63 $8,095.60300100 SHORT-TERM PAVEMENT MARKING 3 FOOT $2.00 $72.0 $16.00 $576. $2.00 $72.0 $7.30 $262.8 $300 $108.0 $10.00 $360.0 $10.00 $360.0 $1.06 $3818300105 IPAVEMENT MARKING REMOVAL FOOT $4.50 $162 00 $10 00 $360 0 $4.00 $144.0 $3.70 $133.2 $2.00 $72.0 $13.50 $486.0 $10.00 $360.0 $10.58 $38088 <br /> X0325977 TEMPORARY TRAFFIC SIGNAL 6 EA $2.700.00 $16,200. $3,25000 $19,5000 $3,200.00 $19,200.0 $3,500.00 $21,000.00 $5,000.00 $30,000.0 $3,740.67 $22.444.02 $100.00 $600.0 $3,173.61 $19,041.66 <br /> ALTERNATE A-FULL DEPTH ASPHALT <br /> 20200100 EARTH EXCAVATION 1,000 $15.00 $15,000 $0.00 $0.00 $0.00 $0. $0.00 $0.00 $0.00 $0 $17.30 $17,300.0 <br /> 35101800 AGG BASE CSE B 6 3,57 SY $8.00 $28,616. $0.00 $0.0 $000 $0 0 $0.00 $0.00 $0.00 $0.0c $9.80 $35,054.60 $0.00 $0.0 $0.00 $0.001 <br /> 40600100 BIT MATLS PR CT 250 GAL $2.70 $67500 $0.00 $0.00 $0.00 $0.0 $0.00 $0.0 $000 $0.00 $5.22 $1,305.00 $0.00 $0 $0.00 $0.0 <br /> 40701921 HMA PAVT FD 12 INCH 3,577 SY $63.40 $226,781.80 $0.00 $0.00 $0.00 $0.0 $0.00 $0.00 $0.00 $0.0 $5564 $199,02428 $0.00 $0.00 $0.00 $0.0 <br /> 70102620 TR CONT SURVEILLANCE 3 CAL DA $700.00 $2,100.00 $000 $0.00 $0.00 $0.0 $0.00 $0.00 $0.00 $0.0 $50000 $1,500 00 $0.00 $0.00 $0.00 $0.00 <br /> TOTAL ALTERNATE A IF $273,172.80 S0. 50.0 S0. So.o $254,183.68 50.0 $0.0 <br /> ALTERNATE B-CONCRETE <br /> 20200100 EARTH EXCAVATION 40 CY $15.00 $6,000.0 $24.75 $9,900. $20.00 $8,000.0 $13.00 $5,200.0 $3000 $12,000.00 $0.00 $0.00 $35.00 $14,000.0 $31.10 $12,440.0 <br /> 35101600 AGG BASE CSE B 4 3,577 TON $6.00 $21,462.0 $9.50 $33,981.5 $9.00 $32,193. $6.70 $23,965.90 $7 00 $25,039.0 $000 $000 $10.00 $35,770.0 $7.52 $26,899. <br /> 42000301 PCC PVT 8 JOINTED 3,577 SY $50.00 $178,850.0 $43.25 $154,705.2 $46001 $164,542.0 $52.00 $186,004. $53.00 $189,581.00 $0.00 $0.0 $65.00 $232,505.00 $74.39 $266,093.0 <br /> 70102620 TR CONT SURVEILLANCE 1 CAL DA $700,001 $7,000.0 $650001 $6.500.00 $200.001 $2,000.00 $600.00 $6,000.00 $170.00 $1,70000 $0.00 $0.00 $0.01 $0.1 $200.00 $2,000.0 <br /> TOTAL ALTERNATE B 5213,312.00 $205,086.7 [�= 5206,735.0 $221,169. 5228,320. $0.00 5282,275.1 $307,432.0 <br /> TOTAL BASE BIDS(AS CORRECTED) 5134,728.0 $107,490.5 F $106,649.9 F $106,685.9 F $112,014.50 5119,115.1 $112,711.5 $142,050.0 <br /> Percent Over Under ENGINEER'S ESTIMATE 20.22% 20.84% 20.81°� 16.86% 11.58% 16.34% 5.43°k <br /> TOTAL BASE BIDS+ALTERNATE A(AS CORRECTED) 5407,900.85 No Alt A Bid No Alt A Bid No Alt A Bid No Alt A Bid $373,299.00 No Alt A Bid No Alt A Bid <br /> Percent Over Under ENGINEER'S ESTIMATE 0E===E===[��E===E===E===E===E=== 8.489/6 <br /> OTAL BASE BIDS+ALTERNATE B(AS CORRECTED) $348,040. 5312 577.2 O 5313,364.90 $327,855.8 $340,334.5 No Alt B Bid $394,886.6 5449,482.0 <br /> Percent Over Under ENGINEER'S ESTIMATE 10.19° 9.96% 5.80°� 2.21°k 13.49% 29.15% <br /> 'tg�� 9 -le-IL <br /> Matthew C.Newell,P.E.,City Engineer Date <br /> Page 1 of 1 <br />