Phase III - FY 2013-2014 Preliminary Construction Cost Estimate <br /> Basin Equipment Sandblast &Recoat $690,000 <br /> Primary Basins Corner Concrete Fill $376,000 <br /> Total $1,066,000 <br /> In order to reduce costs, Black & Veatch will only be providing bid drawings and technical <br /> specifications, and provide limited construction services during each phase. City staff will <br /> provide the majority of the work necessary for bid preparation, advertisement and award. During <br /> construction, City staff will also perform the majority of construction management and <br /> inspection services. <br /> Black & Veatch is recommended for continued assistance with this project as they performed the <br /> original engineering and design work for the SWTP and have provided the City with high quality <br /> professional services on numerous projects since then under a Continuing Agreement for <br /> Engineering Services that was authorized by Council in 2003. This work would be the 19th <br /> project (Task Order No. 19) of the Continuing Agreement. <br /> POTENTIAL OBJECTION: <br /> None foreseen. <br /> INPUT FROM OTHER SOURCES: <br /> Black &Veatch. <br /> STAFF REFERENCE: <br /> Keith Alexander, Director of Water Management, 217-424-2863, kalexander@decaturil.gov <br /> BUDGET/TIME IMPLICATIONS: <br /> Phase I of this project is in this fiscal year's Water Non Lake Capital Fund and is anticipated to <br /> be completed this fiscal year. <br /> Attach. 3 <br /> cc: John Schilling, Black & Veatch <br /> Rick Marley, Director of Public Works <br /> Don Giger, Water Production Operations Supervisor <br /> Steve Leach, Water Production Maintenance Supervisor <br /> 2 <br />