Laserfiche WebLink
SPECIAL OPERATIONS GROUP(GISOG) <br /> 3081nduwW Drive Griffith IN <br /> Global (PH)219-924-6755 (FAX)219-9247505 <br /> Infrastructure Page 3 <br /> GI Special Operations Group,(LC proposal number. Change Order#15-Rev 42 <br /> I lance)[Professional Services Inc. <br /> Lake Decatur Darn Repairs-City Project 09-02 <br /> C►ante Ordtr 15.E Proiect Outline:Toraue Tube RenaimOry Ice Blasting and Paintipa <br /> The damage on the upstream side of the torque tube was exposed after the South Bascule gate on the take Decatur Dam was dewatered.The torque tube surface is <br /> damaged from the bolts holding down the hortzontal rubber seal,and the old rubber seal being installed under the beast plate,making the bottom clamp bar 5t8" <br /> lower than the same bar on the North gate.This damage is mostly paint feihac with some gouging,and resting of the torque tube-This condition was documented <br /> and discussed with Hanson during the site visit.The area was addressed in RFI 0030.As per HI)R's recommendations,dated 815111,the torque tube on the South <br /> gate will be dry ice blasted to achieve a SSPC-SP 1 I surface preparation.All damaged areas will be repaired with the pre-approved epoxy filler,and painted with <br /> the pre-approved paint.. <br /> Change Order 15.E Prosect Costs:Torque Ink Repairs-pry lee Rimini and Painting <br /> This additional work will be billed at the 2011 IDOT Forced Account basis. <br /> Field Services Lake Decatur Dam_-Torque Tube Repairs-D Ice Blaxt*g and Painting <br /> Item Rate II.O.M Qt . Mink u Days cost <br /> Global Cost-1.0bor esi. Actual Per Hr Actual 35% 1 I 534.859.63 <br /> Global Equipment est. Schedule Per Da) Actual N/A 11 $3,188.20 <br /> 1"h3 lie Bl sting- rest Artrarl Per Hr Actual 5% 7 55-3.00040 <br /> Steel Seam FT910 hiller est. 5186.51 Total 5 15% ?VIA $1,072.43 <br /> Aura-Plate 235 Paint est. S252.06 Total 5 15% NA $1,449.35 <br /> Mi sePainuppoxt•supplies est. $500.00 Total 1 15`✓o NIA 5575.00 <br /> 3rdpattvequ4wrent est. $21,967.18 Total 1 5% NIA $23.065.53 <br /> Rondsilnrurance est. $4,338.52 Total 1 10% NIA $4,772.37 <br /> Chan a Order#15.E IDOT 2611 Forced Account Estimated(a} S121,f8252 <br /> Change Ordtr#15.F Proiect Outline:Armature Plates <br /> As per the recommendation from HDR and Hanson after the field visit,the inboard and outboard armature plates shall no longer he replaced.The outboard <br /> armature plate(South side of the South bascule Rabe)does not have slots to be able to remove them as stated in the bid specs..The steel wicornpasses the entire <br /> torque tube.The inboard armature plate(North side of the South bascule gate)is not a stand alone plate.The entire center pier is encased in a i"steel shell that <br /> wraps around the front The plates shall bre stripped of the current coaling,cleaned and recoeted with the pre-approved paint.Any areas of pitting/gouging in the <br /> plates shall be repaired prior to coating with the pre-approved epoxy filler. <br /> Chauae Order#t5.F Proleet Cents:Armature.Plates <br /> Credits:We have listed the labor credit for the bid time to replace the armature plates(same credit as outlined in Change order#4).7'he alternative refurbishment <br /> scope to dry ice blast,till voids with tiller putty,prime and paint are listed below and will be billed at the 2011 IDOT Forced Account basis. <br /> ,Rdd Services Lake Decatur Daae-Anaamre Plates <br /> 11M Rate U.U.M Q(3' Maukll9 Ding Cost <br /> Global C64-1.abor est. Actual Per lir Actual 35% 3 S10,496.79 <br /> Global Equipment est, Schedule Per Day Actual N/A 3 $1.248.02 <br /> Dry ice 8/avtiW- est Actual Per fir Actual 5% 2 $24,000.00 <br /> Steel Seam 1,7910 hiller est. 5186.51 Total 1 15% MA $214.49 <br /> Pura-Plate 235 Paint est. $252.06 dotal I 15% N:A $308.52 <br /> 3rd party equipment est. $5,991.05 Total 1 5% N,'A $6,290.60 <br /> Bondsilnsuranee est $1,295.20 Total 1 10% AM $1,424.72 <br /> Credit for labor not used from original bid `1 7,=' <br /> Chane Order#15.F [DOT 2011 Forced Account Estimated $39,200.93 <br /> Global Infrastructure Spsaal Operations Group,LLC. 308 Industrial Drive,GrI th,IN 46319 PH 219-9248755.FAX 219-924-7505 <br />