Laserfiche WebLink
1 <br /> v <br /> MINE <br /> PROJECT PLAN MANHOUR ESTIMATE <br /> Client: City of Decatur Revision# <br /> Project: II Rte 48/Boyd Road Intersection Date: 2/26/2010 Page# 6 <br /> Labor Product/Activity Class E E E 0 T ET 0 0 0 CT <br /> Phase Code Prod Activity Description Grade VII V 111 0 11 111 0 0 0 III TOTAL <br /> 0 <br /> 11 1 TIE POINTS AND BENCH MARKS J 0 <br /> 1 Prepare Preliminary Tie Points and Bench Mks. 2 2 4 <br /> 2 Prepare Pre-final Tie Points and Bench Mks. 1 2 3 <br /> 3 Prepare Final Tie Points and Bench Mks. 0 <br /> 0 <br /> Subtotal Tie Points and Bench Marks 7 0 <br /> 0 <br /> 13 RAILROAD INTERCONNECT DESIGN 0 <br /> 1 Research Track Sensor Information 4 8 12 <br /> 2 Layout and Design Sensors 8 12 1 20 <br /> 3 1 Submit to Railroad for Review 1 1 <br /> 4 Review comments and revise layout 4 1 4 8 <br /> Subtotal Plan and Profile Sheets 41 0 <br /> 0 <br /> 14 TRAFFIC SIGNAL PLANS 0 <br /> 1 Prepare Signal Layout 8 8 24 40 <br /> 2 Prepare Cable Layout 12 8 16 36 <br /> 3 Prepare Bill of Material and Details 4 4 8 16 <br /> 4 Draft Schedule of Quantities 2 6 8 <br /> 5 Prepare Boring Log 2 2 <br /> 6 Submit for approval(IDOT)(ICC)(CITY) 2 46 <br /> 7 Review Comments and Revise Signal Plans 8 8 16no . <br /> 32 <br /> Subtotal Traffic Control Plans 140 0 <br /> SHEET SUBTOTAL HOURS 52 56 0 0 0 180 0 188 <br /> 7/19/2011 <br /> Fom#210-10(01/05) 7 of 13 A-7 <br />