My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-120 AUTHORIZING AN AGREEMENT WITH HOMER L. CHASTAIN & ASSOCIATES, LLP
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-120 AUTHORIZING AN AGREEMENT WITH HOMER L. CHASTAIN & ASSOCIATES, LLP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 4:32:48 PM
Creation date
8/31/2015 4:32:46 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-120
Res Ord Title
AUTHORIZING AN AGREEMENT WITH HOMER L. CHASTAIN & ASSOCIATES, LLP TO DESIGN REPAIRS TO THE COUNTRY CLUB BRIDGE OVER LAKE DECATUR AND THE GARFIELD BRIDGE OVER 22ND STREET
Department
Public Works
Approved Date
8/1/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t;xniblt H <br /> Exhibit H <br /> DIRECT HOURLY LABOR COSTS OF THE CONSULTING ENGINEER <br /> As of the date of this contract. <br /> Project Name: Bridge Repair: Country Club/Lake Decatur, Garfield/22°d Street <br /> Consulting Engineer: Homer L. Chastain &Associates <br /> Classification Minimum Maximum <br /> Principal 60 62 <br /> Project Manager 55 65 <br /> Structural Engineer 32.30 55 <br /> Senior Engineer 55 58.20 <br /> -Engineer 27 39.50 <br /> Senior Technician 33.90 40.70 <br /> Technician 12.30 30.80 <br /> Professional Land Surveyor 28.90 36 <br /> Construction Inspector 23.50 36.70 <br /> Clerical 14.80 23.70 <br /> H-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.