My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-107 TO APPROPRIATE FUNDS FOR DESIGN IMPROVEMENTS
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-107 TO APPROPRIATE FUNDS FOR DESIGN IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 10:22:03 AM
Creation date
9/1/2015 10:22:02 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-107
Res Ord Title
TO APPROPRIATE FUNDS FOR DESIGN IMPROVEMENTS TO SOUTH SHORES BRIDGE OVER SAND CREEK ARM OF LAKE DECATUR
Approved Date
7/5/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> Mttnicipaiity L Name <br /> City of Decatur Crtation <br /> of��P O URS Corporation <br /> Township L S Address <br /> South Wheatland 345 East Ash Avenue <br /> Preliminary Engineering U <br /> County A Services Agreement L <br /> G For T Cay <br /> Macon E Motor Fuel Tax Funds A Decatur <br /> N N <br /> Section C T State <br /> 09-00905-00-BR y Illinois <br /> THIS AGREEMENT is made and entered into this 5th day of July 2011 between the above Local <br /> Agency(LA)and Consultant(ENGINEER)and covers certain professional engineering services in connection with the <br /> improvement of the above SECTION. Motor Fuel Tax Funds, allotted to the LA by the State of Illinois under the general <br /> supervision of the State Department of Transportation, hereinafter called the"DEPARTMENT', will be used entirely or in part <br /> to finance ENGINEERING services as described under AGREEMENT PROVISIONS. <br /> Section Description <br /> Name South Shores/Sand Creek Bridge Replacement <br /> Route FAU 7398 Length 0.20 Mi. 1062.00 FT (Structure No. 058-6003 ) <br /> Termini 625 feet east and 437 feet west of the bridge(Sta. 85+50.00 to Sta. 96+12.00) <br /> Description: <br /> Provide plans, specifications and estimates for the removal and replacement of the South Shores/Sand Creek Bridge and <br /> adjacent 30"sanitary sewer with a structure 3' higher than the existing bridge. <br /> Agreement Provisions <br /> The Engineer Agrees, <br /> 1. To perform or be responsible for the performance of the following engineering services for the LA, in connection with the <br /> proposed improvements herein before described, and checked below: <br /> a. ® Make such detailed surveys as are necessary for the preparation of detailed roadway plans <br /> b. ❑ Make stream and flood plain hydraulic surveys and gather high water data, and flood histories for the preparation <br /> of detailed bridge plans. <br /> c. ❑ Make or cause to be made such soil surveys or subsurface investigations including borings and soil profiles and <br /> analyses thereof as may be required to furnish sufficient data for the design of the proposed improvement. <br /> Such investigations are to be made in accordance with the current requirements of the DEPARTMENT. <br /> d. ❑ Make or cause to be made such traffic studies and counts and special intersection studies as may be required to <br /> furnish sufficient data for the design of the proposed improvement. <br /> e. ® Prepare Army Corps of Engineers Permit, Department of Natural Resources-Office of Water Resources Permit, <br /> Bridge waterway sketch, and/or Channel Change sketch, Utility plan and locations, and Railroad Crossing work <br /> agreements. <br /> f. ❑ Prepare Preliminary Bridge design and Hydraulic Report, (including economic analysis of bridge or culvert types) <br /> and high water effects on roadway overflows and bridge approaches. <br /> g. ® Make complete general and detailed plans, special provisions, proposals and estimates of cost and furnish the LA <br /> with five(5)copies of the plans, special provisions, proposals and estimates. Additional copies of any or all <br /> documents, if required, shall be furnished to the LA by the ENGINEER at his actual cost for reproduction. <br /> h. ® Furnish the LA with survey and drafts in quadruplicate of all necessary right-of-way dedications, construction <br /> easement and borrow pit and channel change agreements including prints of the corresponding plats and staking <br /> as required. <br /> Note: Four copies to be submitted to the Regional Engineer <br /> Printed 6/30/2011 Page 1 of 4 BLR 05510(Rev. 11/06) <br />
The URL can be used to link to this page
Your browser does not support the video tag.