My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-106 AUTHORIZING AN AGREEMENT WITH URS CORPORATION
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-106 AUTHORIZING AN AGREEMENT WITH URS CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 10:24:26 AM
Creation date
9/1/2015 10:24:22 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-106
Res Ord Title
AUTHORIZING AN AGREEMENT WITH URS CORPORATION FOR ENGINEERING SERVICES TO DESIGN THE FINAL PHASE FOR REPLACEMENT OF THE SOUTH SHORES BRIDGE OVER SAND CREEK ARM OF LAKE DECATUR
Department
Public Works
Approved Date
7/5/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF DECATUR <br /> PROFESSIONAL ENGINEERING SERVICES AGREEMENT <br /> This Agreement("Agreement")is made and entered into between the City of Decatur,Illinois,an Illinois <br /> home rule municipal corporation( "City"),and: <br /> URS Conmoration <br /> ("Consulting Engineer"),for and in consideration of the mutual covenants and promises and good and <br /> valuable consideration contained herein. <br /> SCOPE OF WORK <br /> The professional engineering services obtained by the City under this Agreement concern the Project <br /> ("Project")as set forth in the attached as Exhibit"A",incorporated herein by reference and made a part of <br /> this Agreement hereof: <br /> SECTION I. GENERAL <br /> A. CONSULTING ENGINEER. The Consulting Engineer shall provide professional engineering <br /> services for the City in all phases of the Project, serve as the City's professional engineering <br /> representative for the Project as set forth herein and shall give professional engineering consultation <br /> and advice to the City's Representative during the performance of services hereunder. All services <br /> provided hereunder shall be performed by the Consulting Engineer in accordance with generally <br /> accepted Engineering standards. <br /> B. NOTICE TO PROCEED. The Consulting Engineer shall only begin performance of each Phase of <br /> work required hereunder upon receipt of a written Notice to Proceed for that Phase, as shown in <br /> Exhibit B. <br /> C. TIME. The Consulting Engineer shall begin work on each successive phase within thirty(30)days <br /> after receipt of the Notice to Proceed for each phase and shall devote such personnel,technical <br /> equipment,computer time and materials to the Project so as to complete each phase within the time <br /> limits set forth in Exhibit C; Project Timeline. <br /> D. CITY'S REPRESENTATIVE. The City's representative to the Consulting Engineer shall be the <br /> City Engineer or the City Engineer's designee as set forth in the Notice to Proceed for each phase of <br /> work. <br /> E. EXTRA WORK AND CHANGE ORDERS. The Consulting Engineer shall only perform the <br /> work authorized by this contract and defined in the Scope of Work(attached hereto,marked Exhibit <br /> A,incorporated by reference herein and made a part of this Agreement). Should the size or <br /> complexity of the project exceed the amount of work contemplated by this contract or defined in the <br /> Scope of Work,the Consulting Engineer shall obtain written authorization in the form of a Change <br /> Order from the City's Representative,to perform extra work before such work is actually performed. <br /> A Change Order form is included in this Agreement as Exhibit D. The cost to perform any work prior <br /> to written authorization shall be paid exclusively by the Consulting Engineer and shall not be <br /> reimbursed by the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.