Laserfiche WebLink
y <br /> • December 6, 2010—The City Council approved Resolution R2010-232 authorizing <br /> Supplement ement #1 to the Agreement with URS Corporation for the preliminary design of the <br /> PP �' � p Y g <br /> South Shores Bridge over the Sand Creek Arm of Lake Decatur. The supplement was to <br /> complete the preliminary design to raise the bridge by approximately 3 feet. The <br /> expenditure for the services provided in Supplement #1 was not to exceed $57,200 which <br /> brought the total cost of the preliminary design agreement to $134,700. <br /> BACKGROUND: <br /> South Shores Bridge <br /> The South Shores-Sand Creek Bridge was originally built in 1909. A new superstructure was <br /> placed on the old abutments in 1965. The foundation and abutments are 100 years old and the <br /> super-structure is 45 years old. Routine inspections carried out by City staff and various consulting <br /> engineers since 2004 have determined that the outside beams of this bridge are deteriorating and <br /> have moved with respect to the rest of the bridge. In August 2006,the Illinois Department of <br /> Transportation(IDOT) directed the City to place a weight restriction on the bridge and to perform <br /> follow-up inspections every 6 months to monitor the outside beams of the bridge. Since the <br /> damaged beams are not in the wheel path, the bridge is safe for normal traffic; however, the 6 <br /> month inspections show that the bridge's deterioration is increasing. The bridge needs to be <br /> replaced in the near term before stricter traffic restrictions are imposed. <br /> $1.04 million in Federal Surface Transportation Program—Urban(STU) funding is currently <br /> allocated to fund a portion of the bridge replacement cost. Current preliminary estimates place the <br /> bridge and roadway replacement cost approaching $2 million and the cost to raise the Sanitary <br /> District interceptor at $550,000. Additional STU funding is being requested and the District has <br /> indicated a willingness to cover the interceptor costs. <br /> A public meeting was held on June 29, 2011, at the South Shores Elementary School to present the <br /> latest preliminary design which includes raising the bridge by approximately three feet. <br /> Final Design <br /> The proposed agreement with URS is to complete the final design for the new bridge. The work <br /> includes: <br /> 1. Designing the structure including cofferdams to allow the construction of footings in the <br /> lake. <br /> 2. Design the roadway approaches along the causeway to raise the road level to meet the <br /> increased height of the bridge. <br /> 3. Prepare plan sheets and the project manual in accordance with Illinois Department of <br /> Transportation standards. <br /> 4. Prepare documents to obtain additional right of way and easements for the construction. <br /> 5. Prepare designs to raise the sanitary sewer and address the sanitary sewer services of several <br /> properties on the east side of the bridge that may require a small pump station to be installed <br /> (a portion of this cost will be reimbursed by the Sanitary District of Decatur). <br /> 6. Answer questions during the bidding process. Bids will be advertised and let by IDOT <br /> under agreement with the City. This agreement will come before the City Council in late <br /> 2011. <br /> Page 12 <br />