My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-103 ACCEPTING THE BID AND AUTHORIZING CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-103 ACCEPTING THE BID AND AUTHORIZING CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 10:29:40 AM
Creation date
9/1/2015 10:29:39 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-103
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR NORTH WATER STREETSCAPE ENHANCEMENT - PHASE 1
Department
Public Works
Approved Date
7/5/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Bid Review <br /> The project plans and specifications were prepared by a design team which included Massie <br /> Massie and Associates, Phillip W. Cochran Consulting Engineer, and Architectural Expressions. <br /> The project was advertised on May 25, 2011, and bids were opened on June 9, 2011. The results <br /> for the letting are as follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under) <br /> Otto Baum Company, Inc. $769,808.90 (-8.60%) <br /> Christy-Foltz, Inc. $812,211.05 (-3.57%) <br /> Mid-States General&Mechanical Contracting Corp. $957,395.00 12.96% <br /> Engineer's Estimate $842,251.60 -------- <br /> Otto Baum Company, Inc. provided the lowest, qualified bid. Otto Baum has completed several <br /> similar projects for the City and is a highly respected local contractor. Staff recommends that the <br /> City Council approve a contract with Otto Baum Company, Inc. to perform the first phase of the <br /> Water Street Streetscape project. <br /> Construction Engineering Change Order <br /> During the construction process questions invariably arise regarding various issues that are best <br /> addressed by the design engineer. In addition, City staff may not have the time or expertise to <br /> perform the inspection on some specialty items such as some electrical issues or landscaping. It <br /> is proposed that the design engineer, Phillip W. Cochran be retained to provide assistance in the <br /> construction process as needed. This work will include: <br /> • Answering contractor questions and providing detail approval including shop drawing <br /> review and material approvals. <br /> • Provide some surveying services as needed. <br /> • Respond to landscaping or electrical questions as needed. <br /> POTENTIAL OBJECTION: There are no known objections to this resolution. <br /> INPUT FROM OTHER SOURCES: Massie Massie and Associates, Phillip W. Cochran P.E. <br /> STAFF REFERENCE: Richard Marley, Public Works Director and Matt Newell, City <br /> Engineer. Richard Marley will be in attendance at the City Council meeting to answer any <br /> questions of the Council on this item. <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.