Laserfiche WebLink
KI'1019 DP,pattrr>tent Local Agency State Contract Day Labor Local Contract RR Force Account <br /> of lilmiq)orta6on City of Decatur X <br /> Local Agency Agreement Section Fund Type ITEP Number <br /> for Federal Participation 10-00025-00-EG STE 729012 <br /> Construction Engin rinRi ht-of-W a <br /> Job Number Project Number Job Number Project Number Job Number Project Number <br /> P-97-035-11 TE-OOD7(054) <br /> This Agreement is made and entered into between the above local agency hereinafter referred to as the"LA"and the state of Illinois,acting <br /> by and through its Department of Transportation,hereinafter referred to as"STATE". The STATE and LA jointly propose to improve the <br /> designated location as described below. The improvement shall be constructed in accordance with plans approved by the STATE and the <br /> STATE's policies and procedures approved and/or required by the Federal Highway Administration hereinafter referred to as"FHWA". <br /> Location <br /> Local Name Franklin Street Route FAP 710 Length 2,000 LF <br /> Termini Eldorado Street(US 36)southerly to Wood Street <br /> Current Jurisdiction City of Decatur Existing Structure No n/a <br /> Project Description <br /> Phase I engineering for sidwalks,lighting, landscaping and other beautification to enhance the aesthetic value along the Franklin Street <br /> corridor through downtown Decatur. <br /> Division of Cost <br /> Type of Work STE % STATE % LA % Total <br /> Participating Construction ( ) ( ) ( ) <br /> Non-Participating Construction ( ) ( ) ( ) <br /> Preliminary Engineering 133,098 ( ) ( ) 33,274 ( BAL ) 166,372 <br /> Construction Engineering ( ) ( ) ( ) <br /> Right of Way ( ) ( ) ( ) <br /> Railroads ( ) ( ) ( ) <br /> Utilities ( ) ( ) ( ) <br /> Materials <br /> TOTAL $ 133,098 $ $ 33,274 $ 166,372 <br /> "80%STE Funds NTE$133,098 <br /> NOTE: The costs shown in the Division of Cost table are approximate and subject to change. The final LA share is dependent on the final Federal and <br /> State participation. The actual costs will be used in the final division of cost for billing and reimbursment. <br /> If funding is not a percentage of the total,place an asterisk in the space provided for the percentage and explain above. <br /> The Federal share of construction engineering may not exceed 15%of the Federal share of the final construction cost. <br /> Local Agency Appropriation <br /> By execution of this Agreement,the LA is indicating sufficient funds have been set aside to cover the local share of the project cost and <br /> additional funds will be appropriated,if required,to cover the LA's total cost. <br /> Method of Financing(State Contract Work) <br /> METHOD A--Lump Sum(80%of LA Obligation) <br /> METHOD B-- Monthly Payments of <br /> METHOD C--LA's Share divided by estimated total cost multiplied by actual progress payment. <br /> (See page two for details of the above methods and the financing of Day Labor and Local Contracts) <br /> Printed on 6/15/2011 Page 1 of 5 BLR 05310(12/08/10) <br />