Laserfiche WebLink
Appendix A <br /> Prior Council Actions 2001 —2007 <br /> April 2, 2001 —Council approved Resolution R2001-59, approving an agreement with Bainbridge, <br /> Gee, Milanski &Associates, Inc. for engineering services for the design of the south elevated water <br /> storage tank. This agreement was for a project that would not be funded through the Illinois <br /> Environmental Protection Agency's (I-EPA) Revolving Loan Program. <br /> August 5, 2002—Council received the transmittal of the Strand Water System Master Plan in Study <br /> Session. This Master Plan included recommendations to construct a large diameter water main <br /> centered on Martin Luther King, Jr. Drive to connect the City water towers at Division Street and <br /> Garfield Avenue with the South Water Treatment Plant (SWTP) and install an elevated water tank <br /> on the south side of the City to improve low water pressure concerns south of the Lake. <br /> February 7, 2005—Council approved Resolution 82005-11, which authorized the purchase of a <br /> three (3) acre parcel of land on South Franklin Street Road, a site for the construction of the South <br /> Elevated Water Storage Tank, from Greanias Farms for the price of$60,000. Council approved <br /> Resolution R2005-12 amending an agreement with BGM for the design of the South Elevated <br /> Water Storage Tank for$78,900. The work added by this amendment included changing the scope <br /> of work involved with selecting the water tower site and adding the EPA Loan funding <br /> requirements. <br /> January 22, 2007—Council approved Amendment 2 of the April, 2001 Agreement, which <br /> authorized engineering services to develop a single zone of higher water pressure to be served by <br /> the proposed new water tank. <br /> Page 14 <br />