R2011-57 AUTHORIZING AMENDMENT TO AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-57 AUTHORIZING AMENDMENT TO AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 3:17:50 PM
Creation date
9/1/2015 3:17:49 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-57
Res Ord Title
AUTHORIZING AMENDMENT TO AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
Department
Public Works
Approved Date
5/2/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for the bascule gates were built with the pistons too long. The contract was delayed while the <br /> contractor rectified the problem. <br /> The project is now scheduled for completion in fall of 2011. <br /> Current Design Services Agreement <br /> The Lake Decatur Dam is a Class 1 structure, as classified by the Illinois Department of Natural <br /> Resources. This classification indicates that failure of the dam would have a high probability of <br /> causing loss of life and/or substantial economic loss. As a condition of the Operating Permit, the <br /> City is required to undertake annual inspections. The annual inspections identified work that <br /> culminated in the major repair project that is currently underway at the dam. <br /> On January 20, 2009, the City Council authorized a design services agreement with Hanson <br /> Professional Services (of Springfield, IL)to develop detailed design drawings and prepare <br /> construction documents for a rehabilitation project to address the recommendations contained in the <br /> annual inspection reports for the past five years. The original scope of work for this agreement <br /> identified four general groups of improvements that were needed: <br /> 1. Repairs to the training wall between gated outlet works and spillway <br /> 2. Repairs to north and south sections of the spillway <br /> 3. Repairs to south abutment and training walls <br /> 4. Repairs to the gated outlet structure. <br /> On April 20, 2009, the City Council authorized Amendment 1 to the design services agreement to <br /> add work addressing concerns identified in a detailed inspection of the dam. The work added by <br /> Amendment 1 included the rehabilitation of the mechanical systems that raise and lower the sluice <br /> gates on the north side of the dam, replacing the seals for the bascule gates and sluice gates, and the <br /> removal of non-functioning heating units. Work also included the replacement of the hydraulic <br /> cylinders that raise and lower the long bascule gates along the crest of the dam. <br /> On June 4, 2009, the City Council authorized Amendment 2 to the design services agreement to <br /> provide assistance during the bidding process and the construction phase for the work that was <br /> proposed to be completed over the summer of 2009. <br /> On October 5, 2009,the City Council authorized Amendment 3 which revised the scope of services <br /> to postpone the construction project, and prepare for the work to be rebid for 2010 construction. <br /> Amendment 4 authorizes additional construction services to be used for the 2011 construction on <br /> the dam. Construction services include: construction observation assistance, reviewing contractor <br /> submittals, review of contractor pay requests, responding to contractor information requests, <br /> preparation of change orders, and conducting coordination meetings. <br /> Construction service time is always difficult to foresee given the often unknown nature of how a <br /> project will unfold. Given the age of the dam and the incomplete initial construction plans, many <br /> items are unknown until the construction progress uncovers them. These unknowns expend staff <br /> time and the construction service time expended by Hanson. Additional construction service time is <br /> necessary to complete the dam repair project. <br /> Page 12 <br />