Exhibit A <br /> SCOPE OF WORK <br /> Article 1 of the Agreement is amended and supplemented to include the following agreement of the Parties. ADS shall <br /> provide Basic and Additional Services as set forth below. <br /> Part 1 —Basic Services <br /> ADS will conduct a leak detection/location survey with acoustic and sonic detection equipment on the City's water system <br /> using a one-man crew. We will survey approximately one-third of the total length of water main—estimated to be 176 miles <br /> —each year for three years. We investigate the system by listening directly on all hydrants and main line valves, selected b- <br /> box and service valves with highly sensitive sound intensifying instruments. When ADS encounters potential listening points <br /> that are not accessible, such as buried valves and covered meter boxes, a list of these will be provided to the Water <br /> Department and when corrected they will be listened to provided the leak survey is still in progress. <br /> ADS understands the value of completing a through leak detection survey and our sounding and listening points between <br /> hydrants, valves and curb stops will not exceed 500 feet. On the PVC mains correlation points will not exceed 300 feet <br /> between points. If suitable sounding points are not available at or less than these distances, a correlator may be used to <br /> complete the sounding and leak detection on these specific areas. Depending on the type of pipe material and the specific <br /> leak correlator used,we have successfully correlated leaks at distances greater than 500 feet. <br /> For a project of this size our general approach is to complete three to four days of sounding the system followed by one to <br /> two day of resounding and leak correlating at each potential leak location.After three to four full days of sounding the system <br /> and marking down the potential leak sounds, one to two days will be taken to return to those locations to see if the sound is <br /> still present. The sound may simply be due to usage and resounding will confirm whether or not it is a leak sound. If the <br /> sound is a leak sound, the location will be further investigated with the electronic correlator. This approach of three to four <br /> days sounding and one to two days resounding and correlating will provide a set of organized results for the weekly report <br /> that will be submitted to the City. When a leak is suspected and correlated with a positive result, the location of the leak <br /> indicated by the correlator will be further checked with electronic-ground sounding instruments to verify the position of the <br /> leak. <br /> It is encouraged that all leaks identified during the survey are repaired while the ADS engineers are still working in the City <br /> so that the immediate area can be sounded again in case another leak may have been masked by the original leak noise. <br /> In areas showing indications of leakage, ADS will thoroughly investigate the mains, hydrants, valves and/or services with an <br /> electronic leak correlator and ground microphone to pinpoint the leaks for repair. Leak locations will be marked with <br /> environmentally formulated engineering blue marking paint. ADS will also record all defective system components such as <br /> valves,hydrants and curb stops,as well as any map errors that are noted in the course of carrying out other field activities. <br /> The ADS leakage technicians will be able to conduct the large majority of the survey during normal working hours. In areas <br /> of high traffic volume, ADS will perform this work during"off-hours" and will provide the City with the necessary 24-hour <br /> notice. <br /> A-1 <br /> Exhibits ADS Environmental Services <br />