Laserfiche WebLink
3. Develop a velocity profile at each gauging point installed on the lines from the wells and determine the inside <br /> diameter,where feasible,of each main. <br /> 4. Complete accuracy tests of the meter and totalizer. <br /> 5. Prepare a final report detailing the work completed and the results of the accuracy tests. <br /> Responsibility of the City <br /> • Provide access to the pipe where the test will be conducted <br /> • Provide a suitable corporation tap if one is not available for inserting the Pitometer Caliper and Rod into the <br /> PP h' <br /> pipe for velocity measurements <br /> • Provide electronic readings for the meters being tests if available <br /> • Provide general assistance and supervision in the conduct of the investigations,operating valves and pumps by <br /> competent personnel in connection with the accuracy measurements. <br /> A-4 <br /> Exhibits ADS Environmental Services <br />