My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2011-32 APPROVING AGREEMENT ARCHER-DANIELS-MIDLAND COMPANY
COD
>
City Clerk
>
RESOLUTIONS
>
2011
>
R2011-32 APPROVING AGREEMENT ARCHER-DANIELS-MIDLAND COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 4:14:32 PM
Creation date
9/1/2015 4:14:29 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2011-32
Res Ord Title
AGREEMENT ARCHER-DANIELS-MIDLAND COMPANY WATER AND SEWER MAIN CONSTRUCTION / UTILITY EASEMENT
Approved Date
3/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ILLINOIS ENVIRONMENTAL PROTECTION AGENCY <br /> WATER POLLUTION CONTROL PERMIT <br /> LOG NUMBERS: 1208-11 PERMIT,NO.: 2011-HB-1208 <br /> FINAL PLANS, SPECIFICATIONS,APPLICATION <br /> AND SUPPORTING DOCUMENTS DATE ISSUED: .January .28, 2011 <br /> PREPARED BY: JSD Professional Services, Inc. <br /> I <br /> SUBJECT: DECATUR-ADW Rail-Yard Expansion <br /> (Decatur Sanitary District Sewage Treatment Plant)-Sanitary Sewer Permit <br /> PERMITTEE TO CONSTRUCT PERMITTEE TO OWN AND OPERATE <br /> Archer Daniels Midland Co. City of Decatur <br /> 4666 Faries Parkway 1 Gary K.Anderson Plaza <br /> Decatur, IL 62526 Decatur;IL 62523 <br /> Permit is hereby granted to the above designated permittee(s) to construct and/or operate water pollution control facilities <br /> described as follows (quantities are approximate): <br /> 351 feet of 10 inch sanitary sewer and 2 manholes to serve one office building (6 P.E., 600 GPD, DAF) located at North <br /> Brush College Road with discharge to an existing 12 inch sanitary sewer tributary to the above indicated sewage <br /> treatment plant. <br /> This Permit is .issued subject to the following Special Condition(s). If such Special Condition(s) requires) additional or <br /> revised facilities, .satisfactory engineering plan documents must be submitted to this Agency for review and approval for <br /> issuance of a Supplemental Permit. <br /> SPECIAL CONDITION I: Any connections to this sanitary sewer extension must be in accordance with the latest <br /> Revisions of Title 35, Subtitle C, Chapter 1. Permits must be obtained if required by said regulations. <br /> SPECIAL CONDITION 2: If this project is located within a wetlands, the U.S. Army Corps of Engineers may require a <br /> permit for construction pursuant to Section 404 of the Clean Water Act. <br /> SPECIAL CONDITION 3: The Permittee to Construct shall be responsible for obtaining an NPDES Storm Water Permit <br /> prior to initiating construction if the construction activities associated with this project will result in the disturbance of one <br /> (1)or more acres total land area. <br /> An NPDES Storm Water Permit may be obtained by submitting a properly completed Notice of Intent (NOI) form by <br /> certified mail to-the Agency's Division of Water Pollution Control—Permit Section. <br /> SPECIAL CONDITION 4: Horizontal and/or vertical separation between any sanitary sewers and water mains must be in <br /> conformance with Section 370.350 of the Illinois Recommended Standards for Sewage Works. <br /> THE STANDARD CONDITIONS OF ISSUANCE INDICATED ON THE REVERSE SIDE MUST BE COMPLIED WITH IN <br /> FULL. READ ALL CONDITIONS CAREFULLY.__ _ <br /> SAK:MRA:j:\docs\permits\statecon\ashrafi\1208- DIVISION OF WATER POLLUTION CONTROL <br /> 11.docx <br /> cc: EPA-Champaign FOS #,a,.,4& �. IrLv <br /> JSD Professional Services, Inc. <br /> Decatur Sanitry District <br /> Records-Municipal Alan Keller, P.E. <br /> Binds Manager, Permit Section <br />
The URL can be used to link to this page
Your browser does not support the video tag.