main corridors extending north and south through the downtown: Franklin Street, Water Street and <br /> Main Street (see attached map). <br /> On October 29, 2010,the City was informed by the Illinois Department of Transportation that it had <br /> been awarded an Illinois Transportation Enhancement Program(ITEP) grant for$1.9 million to <br /> design and construct streetscape improvements on Franklin and Main Streets between Eldorado <br /> Street and Wood Street. Due to the size of the grant, it is recommended that the entire ITEP grant be <br /> applied to the streetscape work proposed for the Franklin Street corridor. <br /> The proposed streetscape work is expected to resemble those improvements that were completed on <br /> the east side of the 300 block of North Water Street. The design work will include recommendations <br /> for parking changes and general traffic changes through the downtown. <br /> Professional Engineering Services Agreement <br /> On January 13, 2011, City staff; assisted by Massie Massie and Associates, interviewed four local <br /> engineering firms to provide design services for the City's Downtown Streetscape and Open Space <br /> Enhancement Program. The firms interviewed were, Blank, Wesslink, Cook&Associates; Homer L. <br /> Chastain & Associates; Phillip W. Cochran; and URS Corporation. Following the interviews it was <br /> recommended that PWC perform the engineering design services for the Water Street corridor. PWC <br /> performed the design services for the work previously completed in the 300 block of North Water <br /> Street including the plaza area on the west side of that block. <br /> PWC's work on the Water Street corridor will include: <br /> 1. Provide a topographical survey for the Water Street corridor and the included side streets. <br /> This will include Central Park and a proposed new parking lot in the 300 block of North Main <br /> Street. <br /> 2. Design electrical systems to provide electrical power distribution and street lighting. <br /> 3. Coordinate with area utilities. <br /> 4. Determine the location of any sub-sidewalk vaults. <br /> 5. Work with property owners to assure compatible streetscape designs. <br /> 6. Prepare plans and specifications for taking bids and assist in the bidding process for two <br /> construction contracts. <br /> a. The first contract will include the 400 block of North Water Street including portions of <br /> North Street and the west side of the 300 block of North Water. This project is expected <br /> to begin in May and be significantly completed by the end of July, 2011. <br /> b. The second contract will include Water Street from William Street to Wood Street <br /> includingsome side street work on Main Street. This work should begin in mid-August <br /> g � <br /> and be completed in the early summer of 2012. <br /> Future Design Contracts and Schedules <br /> At upcoming Council meetings, City staff currently intends to recommend that Homer L. Chastain & <br /> Associates perform the engineering design services for the Main Street and Franklin Street corridors. <br /> This will include the ITEP grant work proposed for Franklin Street. It is expected that work will <br /> begin on the Main Street corridor spring of 2012 and the ITEP project will begin on Franklin Street <br /> spring of 2013. <br /> POTENTIAL OBJECTION: There are no known objections to this resolution. <br /> Page 12 <br />