Laserfiche WebLink
DEPARTMENT OF WATER MANAGEMENT <br /> Memorandum No. 2010 - 23 <br /> December 6, 2010 <br /> TO: Honorable Mayor Michael T. McElroy and City Council <br /> FROM: Ryan P. McCrady, City Manager <br /> Keith D. Alexander, Director of Water Management <br /> SUs,)EC'r: William Street Pump Station Motor Control Center Replacement <br /> Capital Project W09-15 <br /> Change Order No. 1 and Project Completion <br /> SUMMARY RECOMMENDATION: <br /> Council adopt the attached Resolution authorizing William Street Pump Station Motor Control <br /> Center Replacement Contract Change Order No. 1 with Bodine Electric of Decatur. <br /> BACKGROUND: <br /> In February of this year Council awarded a $161,950 construction contract to Bodine Electric of <br /> Decatur (Bodine) to replace the motor control center (MCC) at the William Street Pump Station. <br /> The MCC is the high voltage electrical control system for the pump station. <br /> The project was substantially completed on time by September; however, there were two tasks <br /> that required additional time by Bodine to complete: <br /> • Additional wiring to all four booster pump transfer switch soft start position inputs. <br /> • Wiring of booster pump #2 after the pump was installed by City staff. <br /> The delay in performing these tasks did not impact City operations or our ability to use the <br /> William Street Pump Station as the vast majority of the contract tasks were completed on time. <br /> In order to properly complete the contract and associated documentation, Bodine and Strand <br /> Associates, Inc. (the City's consulting engineer for the project) developed the attached Change <br /> Order No. 1 and recommend Council approval, as does City staff. <br /> Approval of the change order will: <br /> 1. Reduce the Citv's project cost by $9,323.30. <br /> 2. Extend the contract completion date by 90 days to December 10, 2010. <br /> 3. Properly document that the project is officially completed on December 10, 2010. <br /> POTENTIAL OBJECTION: <br /> None foreseen. <br /> INPUT FROM OTHER SOURCES: <br /> Bodine Electric of Decatur and Strand Associates, Inc. <br />