My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2010-225 AUTHORIZING AGREEMENT MASSIE MASSIE & ASSOCIATES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2010
>
R2010-225 AUTHORIZING AGREEMENT MASSIE MASSIE & ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2015 9:10:02 AM
Creation date
10/2/2015 9:10:01 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2010-225
Res Ord Title
AUTHORIZING AGREEMENT MASSIE MASSIE & ASSOCIATES INC. DECATUR CORRIDOR MONUMENT DESIGN INSTALLATION PROJECT
Approved Date
12/6/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Meet and talk with stakeholder related to individual projects to obtain opinions and <br /> ideas. <br /> • Prepare press releases and other information on a regular basis to provide to media <br /> outlets for general public information. <br /> • Prepare graphic exhibits and presentations to be exhibited in public locations to <br /> provide community awareness and opportunities for input. <br /> • Prepare the Project Environmental Report. (This proposal assumes NEPA <br /> Categorical Exclusion for Enhancement elements.) <br /> ` 't��1,�K � Design of Projects <br /> • For selected Concept Plans,prepare materials needed to allow implementation of the <br /> projects. <br /> • Subcontract with structural and electrical engineer or others as needed for particular <br /> projects. <br /> • It is anticipated that project implementation will divided into several construction <br /> projects which may be defined as work at a particular project site or a specific type <br /> of work activity. <br /> • Prepare Contract Documents (plans, specifications, front end documents, cost <br /> estimates, etc.)for each project, submitting at the 50°Io, 95% and 100% stage. <br /> • Assist with pre-bid meetings and answering contractor questions. <br /> '" 'TAS K C7 Implementation, Construction Phase <br /> • Provide construction phase services - review contractor submittals, observation, <br /> inspection,punch lists, etc. - as needed. <br /> MASSIE MASSIE&ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.