Laserfiche WebLink
, 9. �,The undersigned certifies neitherthe ENGINEER nor I have: <br /> a, employed or retained for commission, percentage, brokerage, contingent fee or other considerations, any firm or person (other <br /> ' than a bona fide employee working solely for me or the above ENGINEER)to solicit or secure this AGREEMENT, <br /> b. agreed, as an express or implied condition for obtaining this AGREEMENT, to employ or retain the services of any firm or <br /> person in connection with carrying out the AGREEMENT or <br /> c. paid, or agreed to pay any firm, organization or person (other than a bona fide employee working solely for me or the above <br /> ENGINEER) any fee, contribution, donation or consideration of any kind for, or in connection with, procuring or carrying out the <br /> AGREEMENT. <br /> d. are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered <br /> transactions by any Federal department or agency, <br /> e. have not within a three-year period preceding the AGREEMENT been convicted of or had a civil judgment rendered against <br /> them for commission of fraud or criminal offense in connection with obtaining, attempting to obtain or performing a public <br /> (Federal, State or local)transaction; violation of Federal or State antitrust statutes or commission of embezzlement,theft, <br /> forgery, bribery,falsification or destruction of records, making false statements or receiving stolen property, <br /> f. are not presently indicted for or otherwise criminally or civiily charged by a government entity(Federai, State or local)with <br /> commission of any of the offenses enumerated in paragraph(e)and <br /> g. have not within a three-year period preceding this AGREEMENT had one or more public transactions(Federal, State or local) <br /> terminated for cause or default. <br /> 10. To pay its subconsultants for satisfactory performance no later than 30 days from receipt of each payment from the LA. <br /> 11. To submit all invoices to the LA within one year of the completion of the work called for in this AGREEMENT or any subsequent <br /> Amendment or Supplement. <br /> 12. To submit BLR 05613, Engineering Payment Report,to the STATE upon completion of the project (Exhibit B). <br /> 13. Scope of Services to be provided by the ENGINEER: <br /> � Make such detailed surveys as are necessary for the planning and design of the PROJECT. <br /> ❑ Make stream and flood plain hydraulic surveys and gather both existing bridge upstream and downstream high water data and <br /> flood flow histories. <br /> ❑ Prepare applications for U.S.Army Corps of Engineers Permit, Illinois Department of Natural Resources Office of Water <br /> Resources Permit and Illinois Environmental Protection Agency Section 404 Water Quality Certification. <br /> ❑ Design and/or approve cofferdams and superstructure shop drawings. <br /> ❑ Prepare Bridge Condition Report and Preliminary Bridge Design and Hydraulic Report, (including economic analysis of bridge or <br /> culvert types and high water effects on roadway overflows and bridge approaches). <br /> � Prepare the necessary environmental and planning documents including the Project Development Report, Environmental Class of <br /> Action Determination or Environmental Assessment, State Clearinghouse, Substate Clearinghouse and all necessary <br /> environmental clearances. <br /> � Make such soil surveys or subsurface investigations including borings and soil profiles as may be required to furnish sufficient data <br /> for the design of the proposed improvement. Such investigations to be made in accordance with the current Standard <br /> Specifications for Road and Bridge Construction, Bureau of Local Roads and Streets Administrative Policies, Federal-Aid <br /> Procedures for Local Highway Improvements or any other applicable requirements of the STATE. <br /> ❑ Analyze and evaluate the soil surveys and structure borings to determine the roadway structural design and bridge foundation. <br /> ❑ Prepare preliminary roadway and drainage structure plans and meet with representatives of the LA and STATE at the site of the <br /> improvement for review of plans prior to the establishment of final vertical and horizontal alignment, location and size of drainage <br /> structures, and compliance with applicable design requirements and policies. <br /> ❑ Make or cause to be made such traffic studies and counts and special intersection studies as may be required to furnish sufficient <br /> data for the design of the proposed improvement. <br /> � Complete the general and detailed plans, special provisions and estimate of cost. Contract plans shall be prepared in accordance <br /> with the guidelines contained in the Bureau of Local Roads and Streets manual. The special provisions and detailed estimate of <br /> cost shall be furnished in quadruplicate. <br /> ❑ Furnish the LA with survey and drafts in quadruplicate all necessary right-of-way dedications, construction easements and borrow <br /> pit and channel change agreements including prints of the corresponding plats and staking as required. <br /> Page 2 of 7 BLR 05610(Rev. 9/06) <br /> Printed on 12/1/2010 2:21:58 PM <br />