� <br /> Public Works Memorandum <br /> NO. 2010-45 <br /> DATE: August 3,2010 <br /> TO: Honorable Mayor McElroy and City Council Members <br /> FROM: Ryan P. McCrady, City Manager <br /> Richard G. Marley, P.E.,Director of Public Works <br /> SUBJECT: Agreement with Blank,Wesselink, Cook& Associates to Inspect the Garfield <br /> Avenue Bridge over CNIC Railroad <br /> Structure No. 058-6000 <br /> SUMMARY RECOMMENDATION: <br /> Staff recommends that City Council approve the attached Resolution authorizing the Mayor to <br /> sign and the City Clerk to attest to an Agreement for an amount not to exceed $7,900 with Blank, <br /> Wesselink, Cook and Associates (BWC)regarding the structural inspection of the Garfield <br /> Avenue Bridge over the CNIC rail yard. <br /> PRIOR COUNCIL ACTION: <br /> See Appendix A for Council actions that occurred from 2005 to 2009. <br /> BACKGROUND: <br /> 2009 Bridge Rehabilitation Project Status <br /> The Garfield Bridge Rehabilitation project was completed in the early spring of 2010. Paperwork <br /> is currently being completed and audited in cooperation with the Illinois Department of <br /> Transportation, (IDOT) far the final project closeout. The final closeout process can take many <br /> months to complete when federal funding is used in the project. <br /> The contractor exceeded the working days allotted which have resulted in contract deductions. <br /> Portions of the bridge that were encased in concrete were more deteriorated than originally <br /> expected resulting in additional repair costs for strengthening the beams. This and other added <br /> work approved by IDOT has resulted in additions currently estimated to be in the range of$50,000 <br /> although the exact amount is yet to be determined. MFT funds have been allocated in the current <br /> Capital Improvement Plan for the added costs. When a final decision is made by IDOT, the City <br /> Council will be requested to authorize any additional funding that may be required. <br /> New Bridge Inspection <br /> Upon the completion of a project of this magnitude, IDOT requires a new bridge inspection to <br /> serve as the baseline for the bridge inspections that are conducted by the City every two years. <br /> City staff requested a proposal from the local firm of Blank, Wesselink, Cook& Associates, Inc. <br /> (BWC)to perform the inspection. BWC designed the recent improvements to the Garfield Bridge <br /> and assisted the City in the project oversight. BWC proposed a fee of$7,900 to inspect the 630 <br /> foot long structure that extends over the Canadian National rail yard. <br /> Page � 1 <br />