|
Project Name: 2015 Storm Drainage Improvements Project
<br /> Engineer's Estimate Kinney Contractors,Inc. Otto Baum Co.,Inc.
<br /> Project Number: 2015-30 19342 E Frontage Rd 1788 Hubbard Ave
<br /> Raymond,IL 62560 Decatur,IL 62526
<br /> City Engineering Division
<br /> Bid Date: Thursday,September 10,2015 Ph.: 217-229-3322 Ph.: 217-876-1000
<br /> Fax: 217-229-3609 Fax: 217-876-1014
<br /> Time: 10:00 A.M.
<br /> William L.Kinney,Pres. Terry Baum,Pres.
<br /> Fund: Storm Water Capital Projects Donald K.Ailen,Sec.
<br /> Kinnev@roadbuilder.net donallen(cilottobaum.com
<br /> Organization Code: 78487806
<br /> Object Code: 48904U
<br /> item Pay item t]TY Unit Unit Price Totai Unit Price Tota! Unit Price Total
<br /> Number
<br /> X4400170 �NLET DRAINAGE APRON REMOVE AND REPLACE-94 PHILLIPS � L SUM $2,200.00 $2,200.00 $3,000.00 $3,000.00 $2,070.00 $2,070.00
<br /> DRIVE __ _
<br /> X4400170 �NLET DRAINAGE APRON REMOVE AND REPLACE-115 PHILLIPS 1 L 5UM $2,200.00 $2,200.00 $4,000.00 $4,000.00 $2,070.00 $2,070.00
<br /> DRIVE
<br /> X550A005 STORM SEWER,PIPE PROVIDED,WITH TRENCH BACKFILL 55 FOOT $90.00 $4,950.00 $80.00 $4,400.00 $57.50 $3,162.50
<br /> X550A006 STORM SEWER,PIPE PROVIDED,BACKFILL WITH EXISTING 23 FOOT $133.00 $3,059.00 $55.00 $1,265.00 $281.25 $6,468.75
<br /> MATERIAL
<br /> Z0009000 LTERATIONS,CANCELLATIONS,EXTENSIONS,DEDUCTIONS, 1 EACH $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00
<br /> ND EXTRA WORK
<br /> Z0054500 ROCK FILL(SPECIAL) 10 TON $65.00 $650.00 $60.00 $600.00 $287.50 $2,875.00
<br /> Z5510602 RESET EXISTING STORM SEWER PIPE-89 PHILLIPS DRIVE 1 L SUM $2,600.00 $2,600.00 $600.00 $600,00 $5,175.00 $5,175.00
<br /> ����������
<br /> OTAL BIDS(AS CORRECTED $69,393.00 $71,132.00 $91,201.40
<br /> Percent Over Under ENGINEER'S ESTIMATE 2.51% 31.43%
<br /> � � �-/o- /S
<br /> Matthew C.Neweil,P.E.,City Engineer Date
<br /> Page 2 of 2
<br />
|