<br /> Project Name: 1500 Block West Macon Street Reconstruction -
<br /> Engineer's Estimate Christy-Foltz, Inc.
<br /> Project Number: 2010-03 740 S. Main Street ' �
<br /> PO Box 828 _
<br /> City Engineering Division Decatur, IL 62525
<br /> Bid Date: Thursday, July 8, 2010
<br /> Phone: 217-428-8601
<br /> Time: 10:00 A.M. Fax: 217-428-2718
<br /> Fund: brianb(a�christv-foltz.com
<br /> Organization Code: 44434405
<br /> Ob'ect Code: 488800
<br /> Item pay Item QTY Unit Unit Price Total Unit Price Total
<br /> Number
<br /> 31101200 SUB-BASE GRANULAR MATERIAL, TYPE B,4 INCH 350 SY $20.00 $7,000.00 $10.00 $3,500.00
<br /> 42300200 PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 6 INCH 35 SY $25.00 $875.00 $150.00 $5,250.00
<br /> 42400200 PORTLAND CEMENT CONCRETE SIDEWALK, 5 INCH 20 SF $20.00 $400.00 $30.00 $600.00
<br /> 44000200 DRIVEWAY PAVEMENT REMOVAL 35 SY $25.00 $875.00 $40.00 $1,400.00
<br /> 44000500 COMBINATION CURB&GUTTER REMOVAL 60 FT $20.00 $1,200.00 $8.00 $480.00
<br /> 44000600 SIDEWALK REMOVAL 20 SF $5.00 $100.00 $4.00 $80.00
<br /> 60250200 CATCH BASINS TO BE ADJUSTED 2 EA $1,000.00 $2,000.00 $1,000.00 $2,000.00
<br /> 60266600 VALVE BOXES TO BE ADJUSTED 2 EA $750.00 $1,500.00 $110.00 $220.00
<br /> 60604400 COMBINATION CONCRETE CURB&GUTTER, B6:18 60 FT $60.00 $3,600.00 $50.00 $3,000.00
<br /> WM-1 CIPP WATER MAIN LINING 650 FT $250.00 $162,500.00 $245.00 $159,250.00
<br /> A-1 ALTERATIONS, CANCELLATIONS, EXTENSIONS, DEDUCTIONS, � EA $20,000.00 $20,000.00 $20,000.00 $20,000.00
<br /> AND EXTRA WORK
<br /> TOTAL BASE BIDS AS CORRECTED) �B $200,050.00 $195,780.00
<br /> Percent Over Under ENGINEER'S ESTIMATE -2.13%
<br /> ALTERNATE 1 -BRICK PAVEMENT
<br /> 44004400 PAVEMENT REMOVAL SPECIAL 350 SY $25.00 $8,750.00 $25.00 $8,750.00
<br /> BP-1 BRICK PAVEMENT 350 SY $200.00 $70,000.00 $240.00 $84,000.00
<br /> TOTAL ALTERNATE 1 00 $78,750.00 $92,750.00
<br /> ALTERNATE 2-PCC PAVEMENT
<br /> 44004400 PAVEMENT REMOVAL SPECIAL 350 SY $20.00 $7,000.00 $50.00 $17,500.00
<br /> 42000100 PORTLAND CEMENT CONCRETE PAVEMENT 6 INCH 350 SY $85.00 $29,750.00 $95.00 $33,250.00
<br /> TOTAL ALTERNATE 2 00 $36,750.00 $50,750.00
<br /> TOTAL BASE BID+ALTERNATE 1 BRICK PAVEMENT �� $278,800.00 $288,530.00
<br /> Percent Over Under ENGINEER'S ESTIMATE 3.49%
<br /> TOTAL BASE BID+ALTERNATE 2 CONCRETE PAVEMENT $236,800.00 $246,530.00
<br /> Percent Over Under ENGINEER'S ESTIMATE 4.11%
<br /> � �?�/�v�e^�i�-/ 7- �j -/D
<br /> Matthew C. Newell, .E., City Engineer Date
<br /> Page 1 of 1