Laserfiche WebLink
Exhibit A <br /> Brush College Road/NS Crossing Study <br /> Stakeholder Interviews <br /> Principal Project Sr.Struct Struct Sr.Civil Civil Civil Senior Sr.Trans. Plannerf Traffic Track Tech Env. Surveyar Surveyor Geotech Geotech MH <br /> Task Mana er En ineer En ineer En ineer En . 1 En .2 En ineer Planner Pub.Inv. En ineer Desi ner En ineer 1 2 t 2 Totals '' <br /> Stakeholder Interviews 00160 <br /> Pre are Questionaire 1 4.0 4.0 <br /> Set U Internet Questionaire 2 8.0 8.0 <br /> Process Questionaire Res onse 3 8.0 16.0 24.0 <br /> Subtotal-1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1 2.0 24.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 36.0 <br /> Norfolk Southern 4 6.0 24.0 8.0 18.0 56.0 <br /> Canadian National 5 4.0 8.0 4.0 8.0 24.0 <br /> ADM 4 4.0 24.0 6.0 18.0 6.0 58.0 <br /> Tate &L le 5 2.0 8.0 6.0 16.0 <br /> Ameren IP 6 16.0 4.0 12.0 8.0 40.0 <br /> Brush Colle e School 2.0 2•� <br /> Decatur Public School District 1.0 1.0 <br /> Richland Communit Colle e 1.0 1.0 <br /> Decatur Public Transit 1.0 1.0 <br /> Decatur Park District 0.5 0.5 <br /> Decatur Bic cle Club 0.5 0.5 <br /> Emer enc Services Police, Fire, Ambulance 6.0 2.0 4.0 12.0 <br /> Economic Dev. Cor . of Decatur& Macon Co. 2.0 2.0 4.0 <br /> Cit of Decatur 4 24.0 6.0 6.0 8.0 44.0 <br /> Macon Count 1.0 1.0 <br /> Illinois De artment of Trans ortation 7 5.0 21.0 15.0 15.0 15.0 71.0 <br /> Illinois Commerce Commission 8 12.0 8.0 8.0 6.0 34.0 <br /> Other Stakeholders 12.0 2.0 6.0 20.0 <br /> Subtotal-2 21.0 164.0 0.0 47.0 37.0 4.0 61.0 0.0 0.0 0.0 0.0 44.0 8.0 0.0 0.0 0.0 0.0 0.0 386.0 <br /> Total This Task 21.0 164.0 0.0 47.0 37.0 4.0 61.0 0.0 12.0 24.0 0.0 44.0 8.0 0.0 0.0 0.0 0.0 0.0 422.0 <br /> Assumptions <br /> (1) 1 on-line surveys;This will be an issues identification survey early in study process <br /> (2) Will likely use Survey Monkey. <br /> (3) This will be a brief inemo which includes tables and charts summarizing survey results. <br /> (4) Assume six(6) meetings at 2 hours each plus two (2) PM hours for preparation/summary for each meeting <br /> (5) Assume two (2) meetings at 2 hours each plus two(2) PM hours for preparation/summary for each meeting <br /> (6) Assume four(4) meetings at 2 hours each plus two (2) PM hours for preparation/summary for each meeting <br /> (7) Assume three (3) meetings at IDOT D7- Effingham - 3 hour travel+2 hour meeting =5 hours x 3+2 PM hours for prep/summary for each meeting <br /> (8) Assume two (2) meetings/hearings with ICC in Springfield, IL-2 hour travel+2 hour meeting=4 hours x 2+2 PM hours for prep/summary for each meeting <br /> Direct Costs <br /> Travel Costs (Jim Meyer): 2 trips @ $200.00 /trip= $400.00 <br /> Misc Mileage: 40 trips x 6 miles /trip @ 0.50/mile = $120.00 II <br /> Mileage to Effingham - IDOT D7: 3 trips x 140 miles /trip Qa 0.50/mile = $210.00 <br /> Mileage to ICC-Springfield, IL: 2 trips x 86 miles /trip @ 0.50/mile = $86.00 �, <br /> Per Diem: 4 days x 2 men @ 10.00/day = $80.00 <br /> I <br /> Total Direct Costs This Task: $896.00 <br /> Scope 6-4-10 <br />