My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2010-140 AUTHORIZING AGREEMENT WITH URS CORPORATION
COD
>
City Clerk
>
RESOLUTIONS
>
2010
>
R2010-140 AUTHORIZING AGREEMENT WITH URS CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2015 8:26:42 AM
Creation date
10/7/2015 8:26:22 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2010-140
Res Ord Title
AUTHORIZING AGREEMENT WITH URS CORPORATION FOR ENGINEERING SERVICES FOR BRUSH COLLEGE ROAD SUBWAY STUDY
Department
Public Works
Approved Date
7/6/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Preliminary Design Documents. Prepare preliminary design documents cousisting of final design <br /> criteria, preliminary drawings and outline specifications. Specific requirements of the aforementioned <br /> Preliminary Design Documents are included in Exhibit A, Scope of Services. <br /> 3. Revised Project Costs. Submit a Preliminary Design Opinion of Probable Project Costs based on the <br /> results of this phase of work including construction costs, contingencies, allowances for charges of all <br /> professionals and consultants, allowances for the cost of land and rights-of-way, allowances for the <br /> relocation of utility facilities and equipment if necessary, and compensation for or damages to <br /> properties and interest and financing charges utilizing and based on the information obtained ar <br /> produced during the preliminary design phase and documents. <br /> �� �� <br /> > <br /> � <br /> 5. Document Presentation. Furnish paper copies and digital copies of the Preliminary Design Report <br /> ("Design Report") in the number and fortnat specified in the Exhibit A, Scope of Work and present <br /> and review the Design Report in person with the City as the City's Representative shall direct. The <br /> cost of document reproduction shall be considered to be a reimbursable expense and paid in <br /> accordance with Section VI(C)of this Agreement. <br /> 6. Com�letion Time. The Preliminary Design Report shall be completed, submitted and accepted by the <br /> City's Representative within the time period set forth in Exhibit C, Project Timeline. <br /> C. FINAL DESIGN PHASE. —This Section Intentionally Left Blank <br /> D. BIDDING PHASE. —This Section Intentionally Left Blank <br /> E. CONSTRUCTION SURVEY AND LAYOUT PHASE.—This Section Intentionally Left <br /> Blank <br /> F. CONSTRUCTION INSPECTION PHASE. —This Section Intentionally Left Blank <br /> SECTION IIL CITY'S RESPONSIBILITIES <br /> The City shall, <br /> A. FURNISH REQUIREMENTS AND LIMITATIONS. Provide all criteria and full information as <br /> to the City's requirements for the Project, including design objectives and constraints, space, <br /> capacity and performance requirements, flexibility and expandability, economic parameters and <br />
The URL can be used to link to this page
Your browser does not support the video tag.