My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2010-102 ACCEPTING BID ROSS & WHITE COMPANY
COD
>
City Clerk
>
RESOLUTIONS
>
2010
>
R2010-102 ACCEPTING BID ROSS & WHITE COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2015 9:55:14 AM
Creation date
10/7/2015 9:55:13 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2010-102
Res Ord Title
ACCEPTING BID ROSS & WHITE COMPANY - TRANSIT WATER RECYCLING SYSTEM
Department
Mass Transit
Approved Date
5/17/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> 10) Wash Tank: 500 Gallon capacity poly tank equipped with a 4" overflow, low water cut-off <br /> and fresh water adjustable make-up controls installed. <br /> 1 1) Solenoid Valve: 2" Slow closing solenoid valve for make-up to wash tank. <br /> 12) Control Panel: Prewired panei, NEMA #12 rated enclosure for wall mounting including <br /> starters, fusing devices, terminals strips, relays and through the door mainline disconnect <br /> switch. Underwriter's Laboratories approved and labeled. <br /> 13) All fittings and valves as necessary to assure proper operation and facilitate field <br /> maintenance. <br /> Finish: All fabricated sections of washer frame, brush yokes and arms, roof mop frame, spray arch <br /> frames and miscellaneous structure shall be hot-dipped galvanized after fabrication per ASTM A123 or <br /> A385. Metallic surfaces not suitable for galvanizing shall be coated with 95% zinc primer and covered <br /> with durable machine enamel. All erection bolts shall be plated Grade 5. <br /> Drawings Operation and Maintenance Manua/s Service Repuirements: <br /> 1) Complete piping, wiring, assembty, and foundation drawings shall be supplied by the wash <br /> system manufacturer. Such information to include (3) Sets of Operating and Maintenance <br /> Instructions. <br /> 2) Upon completion of equipment installation, a qualified representative of the manufacturer <br /> shall be present to check-out the equipment, place it into initial operation, and instruct the <br /> owner's personnel in the operation and proper care of the equipment. <br /> 3) Service Requirements: <br /> Water - 2" Supply Line at 40 PSIG Minimum <br /> Electric - 208/230/460/480 Volt, 3 Phase, 60 Hertz <br /> Peak Load - 17.5 Horsepower with 500 Volt AMP Control Circuit <br /> Drain - 6" Minimum <br /> Warranty: The reclaim equipment shall be warranted against defective parts and faulty workmanship <br /> for a period of twelve months from the date of start-up. This warranty shall consist of the replacement <br /> and installation of defective assemblies or parts without cost to the owner for a period of 90 days. <br /> From 91 days to 365 days after start-up, the warranty shall consist of replacement of parts only at no <br /> cost to the owner. This warranty shall not cover malfunctions of valves due to foreign objects in the <br /> supply lines, malfunctions due to freezing, malfunctions due to maladjustments of controls because of <br /> tampering by unauthorized personnel, or malfunctions due to misuse or abuse of the equipment. <br /> � <br /> Pg. 2 of 2 <br /> Specification <br /> Water Recycling System <br /> Model WW075-150X1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.