My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2010-78 ACCEPTING BID KING-LAR COMPANY
COD
>
City Clerk
>
RESOLUTIONS
>
2010
>
R2010-78 ACCEPTING BID KING-LAR COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2015 10:50:16 AM
Creation date
10/7/2015 10:50:15 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2010-78
Res Ord Title
ACCEPTING BID KING-LAR COMPANY - TRANSIT BUS BARN HEATING SYSTEM
Department
Mass Transit
Approved Date
4/19/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�. � � s =- <br /> r <br /> HEATER PARAMETER/SPECIFlCAT10NS �RADIANT 1'UBE HEATER CDNSTRUCTfON <br /> • Gas fired radiant tube heaters shalf be furnished and instailed • Total heater shutdown shall occur in the event of circuit <br /> in accordance with governing codes and as shown per control lockout. An interruption of power (reset thermostat) <br /> drawing�s) provided. Radiant tube heaters shall be will restarf the firing sequence. <br /> RE-VERBER-RAY HLV SERIES of the modei numbers and • Total heater shutdown shall occur in the event of circuit <br /> inputsfs) in BTU/H as manufactured by Detroit Radiant control lockout. An interruption of power(reset <br /> Products Company, Warren, MI 48089. thermosiat) will restarf the firing sequence. <br /> • Radiant tube heaters shall be Design Certified by the • Heater's controi housing shall be totally enclosed with a <br /> Canadian Standards Association (CSAJ and comply with corrosion resistant enameled steel exterior. The controls shall <br /> current Occu{�ational Safety and Health Act �OSHA) be easily serviceable by removing one (1) panel. <br /> Requirements. <br /> • The supplier shall provide a manufacturer's published • Heater's combustion chamber shall be 4" O.D. 1 bga. titanium <br /> warranty covering the heater's stainless steel burner for a alloy treated steel finished with a high emissivity rated, <br /> corrosion resistant, black coating (unless noted otherwise). <br /> period of ten (10) years,combustion and aluminized radiant <br /> emitter tube(s) assembly for a period of flve �S) years, • Heater's radiant emitter t�be shall be 4" O.D. 1 bga. <br /> combustion and hot-roiled radiant emitter tube(s) assembly aluminized steel finished with a high emissivity rated, corrosion <br /> for a period of three (3) years, vacuum pump for a period resistant, black coating. Optional hot rolled, uncoated steel <br /> of one (1) year, and all components utilized in the heater shall be made available upon request. <br /> control assembly for a period of one (1) year. • The heater's combustion chamber and radiant emitter <br /> • The supplier shail furnish the owner/contractor with tube shall incorporate a 4"siip flt connection in which the <br /> copies of the engineering specification forms,showing upstream tube slides into the next tube and is held by a <br /> physical dimensions,installation detail,recommendations, bolted clamp. <br /> control wiring diagrams, and spare parts list. • Heater's condensing tubes shall be 1 bga.304 stainless steel. <br /> • Radiant tube heaters shall be designed to satisfactorily • The hot surface igniter shall be readily accessible and <br /> operate at a minimum in�et pressure of inches W.C.P. serviceable. <br /> to a maximum inlet pressure of inches W.C.P. • Reflectors shali be .025 polished aluminum with a multi- <br /> • Radiant t�be heaters shall be designed to operate without faceted design which includes reflector end caps. Reflectors <br /> adjustments when burning natural gas having a heat value shall be rotatable from 0 to 45 degrees when required. The <br /> of BTU per cubic foot with a specific gravity of heater's reflector hanging system shall be designed to permit <br /> or when burning propane gas have a heat value of 2500 BTU expansion while minimizing noise and/or rattles. <br /> per cubic foot with a specific gravity of 1.53. Reflectors shall be assembied to the heater without <br /> • An Installation, Operation, and Maintenance Manual shall be the use of tools. <br /> supplied with each heater. • The heaters shall include a downstream turbulator baffle for <br /> maximum thermai efficiency, 2' stainless steel flex connector, <br /> =RADIANTTUBE HEAT:ER;B.UitNER.CtONTRtOt�S hanging kit and 1/2"gas cock shut-off. <br /> ` " ` • Heaters shall be equipped with a sight glass allowing a visual <br /> • System shall be a negative pressure operation with a power inspection of ignitor and burner operation from the floor. <br /> exhauster assembly at the exhaust end. • The radiant tube heaters shall be designed such that, at the <br /> • Heater's power exhauster (PB Series) shall have a steel shaft customers option, outside combustion air may be supplied <br /> and a cast aluminum housing. without the use of additional supply fans. An air intake collar <br /> shall be supplied as part of the burner control assembly to <br /> • Heater shall have a self-diagnostic ignition control module. accept a 4"O.D.supply duct. <br /> • Heater shall be equipped with a hot surface ignitor with a three <br /> (3) time ignition triai to sensing mode. • All reflectors may be upgraded to 304 Series stainiess steel. <br /> • Power supplied to each exhauster assembly shall be 120VAC, • System design shall allow for condensing operation as <br /> 60HZ. stated in the HLV Design Guide. Condensing areas shall be <br /> • Flame sensing shall be via an independent sensing rod and provided with 304 Series stainless steel tubes,ciamps,and in- <br /> circuit. line accessories. <br /> • The main burner shall be constructed of stainless steel. <br /> • The control assembiy shall be Design Certified by CSA,shall <br /> provide main burner regulation,and shall be of the redundpnt <br /> type. <br /> • Heater controls shall include a safety differential pressure <br /> switch. <br /> • The heater's control system shall be designed to shut off the <br /> gas flow to the main burner in the event either a gas supply or <br /> power supply interruption occurs. <br /> • The heater's air flow control system shall provide a 4 second <br /> pre-p�rge prior to initiating burner operation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.