My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2010-49 ACCEPTING BID
COD
>
City Clerk
>
RESOLUTIONS
>
2010
>
R2010-49 ACCEPTING BID
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2015 10:39:55 AM
Creation date
10/9/2015 10:39:55 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2010-49
Res Ord Title
ACCEPTING BID CHRISTY-FOLTZ, INC. - TRANSIT BUS BARN REMODELING
Department
Mass Transit
Approved Date
3/15/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> 20. Cap and seal unused waste water pipes <br /> 21. Remove inin-oi•s and replace with commercial gi•ade mii-roi-s, sized and positioned <br /> to meet the ADA regulations <br /> 22. Install the followiug items to meet all applicable ADA regulations: wall inounted <br /> liquid soap and paper towel dispensers, ioilet paper dispensers, door hoolcs, door <br /> ]iardware, faucets, signs, etc. <br /> 23. Remove the existing light switches and install new lithe switches to meet ADA <br /> regulations <br /> Additional Worlc <br /> � tin electric water cooler and re lace with an ADA com liant, <br /> 24. Remove the exis g p P <br /> electric, energy efficient water cooler <br /> 25. Remove existing electric water heater and replace with tanlcless, "on-demand", <br /> electric water heater. The water heater is to be sized to provide sufficient hot <br /> water for the two restrooms and far one worlcer washing one vehicle by hand. <br /> (Located on the mezzanine floor, directly above the water cooler) <br /> 26. Remove the existing hose bibs (below water cooler) and install new hose bibs 3" <br /> away (west) using rigid copper pipe that is the same diameter as the existing <br /> pipes. The new hoe bibs are to be located 24" fi-om the floor. <br /> 27. Install bacicflow preventers on the incoming domestic and fire protection water <br /> lines to meet cun�ent building codes <br /> 28. Replace 13 electrical receptacles with GFCI receptacles <br /> 29. Install bonding jtunper around the existing water meter <br /> 30. Remove and replace four (4) lighted exit signs to meet ctu-rent building codes <br /> General <br /> 31. Properly dispose of all scrap/waste materials <br /> '` G(xfR4t <br /> � pQ <br /> � �v l' <br /> or,MEP1(,'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.