My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2010-49 ACCEPTING BID
COD
>
City Clerk
>
RESOLUTIONS
>
2010
>
R2010-49 ACCEPTING BID
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2015 10:39:55 AM
Creation date
10/9/2015 10:39:55 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2010-49
Res Ord Title
ACCEPTING BID CHRISTY-FOLTZ, INC. - TRANSIT BUS BARN REMODELING
Department
Mass Transit
Approved Date
3/15/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Jones & Sullivan Enterprises, Inc. Quotation <br /> 2955 N. Dinneen Street Quote Number <br /> P.O. Box 3015 600s <br /> Decatur, IL 62524 <br /> 217/877-7554 Fax: 217/877-9086 <br /> Decatur Public Transit System <br /> To 555 E. Wood Street <br /> Decatur, IL 62523 <br /> QUOTE qATE VALID THRCI FOR PAGE <br /> 2/26/2010 3/27/2010 2 <br /> 14. Repair and repaint concrete block walls (commercial grade, enamel wall paint) <br /> 15. Repair and repaint ceilings and vent conduits (commercial grade, enamel paint) <br /> 16. Remove entrance doors and frames, widen doorway openings, and install steel doors and <br /> frames, with handles and closers, to meet ADA regulations (Doors and frames to be <br /> painted with commercial grade enamel paint.) <br /> 17. Remove all existing light fixtures and replace with similar, energy efficient fixtures with light <br /> diffusing covers <br /> 18. Remove and replace vent grills <br /> 19. Remove all existing plumbing fixtures and dividers, and replace with heavy duty, commercial <br /> grade fixtures, dividers, and grab bars to meet all applicable ADA regulations. <br /> (Dividers to be factory coated / painted.) <br /> 20. Cap and seal unused waste water pipes <br /> 21. Remove mirrors and replace with commercial grade mirrors, sized and positioned to meet the <br /> ADA regulations <br /> 22. Install the following items to meet all applicable ADA regulations: wall mounted liquid soap <br /> and paper towel dispensers, toilet paper dispensers, door hooks, door hardware, faucets, <br /> signs, etc. <br /> 23. Remove the existing light switches and install new light switches to meet ADA regulations <br /> ADDITIONAL WORK <br /> 24. Remove the existing electric water cooler and replace with an ADA compliant, electric, energy <br /> efficient water cooler <br /> 25. Remove existing electric water heater and replace with tankless, "on-demand", electric water <br /> heater. The water heater is to be sized to provide sufficient hot water for the two restrooms <br /> and for one worker washing one vehicle by hand. (Located on the mezzanine floor, directly <br /> above the water cooler.) <br /> 26. Remove the existing hose bibs (below water cooler) and install new hose bibs 3' away (west) <br /> Date of Acceptance Signature <br /> Please sign and return one copy. If accepted,Jones& Sullivan Enterprises, Inc. is authorized to display a yard sign at project site. <br /> J & S Drywall Service Moomey Painting Company J & L Drywall Supply <br /> 217/877-7176 217/233-3151 217/877-4068 <br />
The URL can be used to link to this page
Your browser does not support the video tag.