Laserfiche WebLink
� <br /> �,. <br /> EQUIPMENT EXPENSE TOTAL EQU{P. AMOUNT <br /> DATE DESCRIPTION HOURS RATE <br /> 01/12/10 50,000 Ib. GVW Tandem Dump#4 4.00 33.20 132.80 <br /> 50,000 Ib. GVW Tandem Dump#7 - 33.20 - <br /> 25T Lowboy 4.00 41.30 165.20 <br /> 18,000 Ib. GVW Service Truck#6 - 21.10 - <br /> 18,000 Ib. GVW Service Truck#3 9.50 21.10 200.45 <br /> 143 HP Excavator on Track 9.50 71.94 683.43 <br /> (125 Cu.Yd. Bucket) <br /> 95 HP Loader Backhoe - 39.00 - <br /> 125 HP Cat. Track/Loader - 61.20 - <br /> 300 Sq. Ft. Trench Box per Day#1 1.00 150.00 150_00 <br /> Traffic Control per Day - 65.00 - <br /> 01/13/10 50,000 Ib. GVW Tandem Dump#4 5.00 33.20 166.00 <br /> 50,000 Ib. GVW Tandem Dump#7 - 33.20 - <br /> 25T Lowboy 5.00 41.30 206.50 <br /> 18,000 Ib. GVW Service Truck#6 - 21.10 - <br /> 18,000 Ib. GVW Service Truck#3 5.00 21.10 105.50 <br /> 143 HP Excavator on Track 5.00 71.94 359.70 <br /> (1.25 Cu. Yd. Bucket) <br /> 95 HP Loader Backhoe - 39.00 - <br /> 125 HP Cat. Track/Loader - 61.20 - <br /> 300 Sq. Ft. Trench Box per Day#1 - 150.00 - <br /> Traffic Control per Day - 65.00 - <br /> ---- <br /> - - <br /> �-----------, <br /> I�TOTAL EQU{PMENT EXPENSE ; , 2 169.58� <br /> i <br /> I <br /> PAG E 2 <br />