My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2010-22 ACCEPTING THE BID AND AUTHORIZING CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2010
>
R2010-22 ACCEPTING THE BID AND AUTHORIZING CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2015 1:59:12 PM
Creation date
10/12/2015 1:59:09 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2010-22
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR THE LAKE DECATUR DAM REPAIR PROJECT
Department
Public Works
Approved Date
2/16/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX B <br /> A Summary of the Major Construction History of Lake Decatur Dam <br /> The City owns and operates the Lake Decatur Dam located on the Sangamon River just west of <br /> Business Route U.S. 51. Built in 1922, the dam provides an impoundment for the City's source of <br /> drinking water. In 1955 bascule gates were added to the concrete spillway to increase the lake level <br /> from elevation 610 to 614.5. The following table summarizes the history of major construction <br /> projects for the Lake Decatur Dam: <br /> Year Activi <br /> 1922 Original Construction <br /> 1950's Fish ladder removed <br /> 1954-55 Flashboards removed and bascule gate installed <br /> Sluice ate re lacement and trash racks installed <br /> 1955-1996 Sluice gates reconditioned <br /> 1955-1996 Resurfaced downstream face of s illwa access latform <br /> 1995 Overlay placed on downstream face of spillway <br /> 1996 Shotcrete applied to left and right abutment walls <br /> 1998 North bascule ate hydraulic c linders refurbished (C linders 1 thru 4) <br /> 2000 South bascule gate hydraulic cylinders refurbished (Cylinders 5 thru 8) <br /> 2000 A roximately 30 concrete anels on u stream slo e of ri ht embankment re laced <br /> 2000 Pile cap and all concrete panels along the downstream right riverbank training wall <br /> re laced. <br /> 2001 New joints saw cut into spillway overlay to match original dam joints <br /> 2001 Spalling along upstream face of outlet works and downstream face of spillway <br /> atched <br /> 2001 New riprap placed downstream of stilling basin and along the left river bank <br /> 2004 New sluice ate lift mechanism at the lower tail water dam <br /> 2005 Spalling along upstream face of outlet works structure patched <br /> Page � 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.