Laserfiche WebLink
/�.� a����rt Local Agency State Contract Day Labor Local Contract RR Force Account <br /> . � <br /> ' `� ������ City of Decatur � � � � <br /> Local Agency Amendment#1 for sec�ion: 08-00602-00-BR Fund T <br /> Federal Partici ation vae: ARU/STU ITEP Number: <br /> Construction Engineering Right-of-W ay <br /> Job Number Project Number Job Number Project Number Job Number Project Number <br /> C-97-026-10 M-ARA-5169(045) <br /> This Amendment is made and entered into between the above local agency hereinafter referred to as the"LA"and the state af Illinois,acting by and through <br /> its Department of Transportation,hereinafter referred to as"STATE". The STATE and LA jointly propose to improve the designated location as described <br /> below. The improvement shall be constructed in accordance with plans approved by the STATE and the STATE's policies and procedures approved andlor <br /> required by the Federal Highway Administration hereinafter referred to as"FHWA". <br /> BE IT MUTUALLY AGREED that all remaining provisions of the original agreement not altered by this Amendment shall remain in full force and effect and the <br /> Amendment shall be binding upon and inure to the benefit of the parties hereto,their successors and assigns. <br /> Amended Division of Cost <br /> Type of Work FHWA % STU % LA % Total <br /> Participating Construction 447,408 ( ' ) 688,592 ( " ) 284,000 ( BAL ) 1,420,000 <br /> Non-Participating Construction ( ) ( ) ( ) <br /> Preliminary Engineering ( ) ( ) ( ) <br /> Construction Engineering ( ) ( � � � <br /> Right of Way ( ) ( ) ( ) <br /> Railroads ( ) ( ) ( � <br /> Utilities ( ) ( ) ( � <br /> Materials <br /> TOTAL $ 447,408 $ 688,592 $ 284,000 $ 1,420,000 <br /> •100%ARU funds NTE$447,408 to be utilized first <br /> *'80%STU funds NTE$688,592 <br /> NOTE: The costs shown in the Division of Cost table are approximate and subject to change. The final LA share is dependent on the final Federal and � <br /> State participation. The actual costs will be used in the final division of cost for biiling and reimbursment. <br /> If funding is not a percentage of the total,place an asterisk in the space provided for the percentage and explain above. , <br /> The Federal share of construction engineering may not exceed 15%of the Federal share of the final construction cost. II <br /> APPROVED APPROVED <br /> Local Agency State of Illinois <br /> Department of Transportation <br /> Michael T. McElroy <br /> (Print or Type Name) Gary Hannig,Se Transportation Date <br /> Mayor By: <br /> (C n/Mayor/Vil .) (Delegate s ignature) <br /> G / William R. Fre De ut Dir`�M1 or of Hi hwa s <br /> � ��� , � `1 <br /> ��'� �G"� V (Delegate's Name-Printed) <br /> (Si natur Date <br /> L/'��� ��� �C-�'�oC pw� �4-U,Z-1 O <br /> Christine M.Reed,Direc or of ighways/Chief Engineer Date <br /> TIN Number <br /> /�� �l <br /> NOTE: If signature is by an APPOINTED offiCial,a resolution authorizing Ellen J.Schanzle-Haskins,Chief ounsel Date <br /> said appointed official to execute this agreement is required. <br /> �L� �. <br /> Ann L.Schneider,Director of Finance and Administration Date <br /> Printed 2/4/2010 BLR 05311 (Rev.05l28/09) <br />