My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2009-244 REJECTING THE BIDS
COD
>
City Clerk
>
RESOLUTIONS
>
2009
>
R2009-244 REJECTING THE BIDS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2015 3:29:23 PM
Creation date
10/12/2015 3:29:22 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2009-244
Res Ord Title
REJECTING THE BIDS - LAKE DECATUR DAM BASCULE GATE HYDRAULIC CYLINDER PROCUREMENT
Department
Public Works
Approved Date
12/7/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hanson Professional Services Inc. <br /> HANSON1525 S.Sixth St. <br /> Springfield,IL 62703 <br /> Engineering � Architecture � Planning � Allied Services (217)788-2450 <br /> Fax:(217)788-2503 <br /> www.hanson-inc.com <br /> November 20, 2009 <br /> Mr. Matthew Newell <br /> City of Decatur <br /> Public Works Department <br /> 1 Gary K. Anderson Plaza <br /> Decatur, IL 62523 <br /> Re: Evaluation of Bids for Hydraulic Cylinder t rocurement <br /> Lake Decatur Dam Spillway Structure Repairs <br /> Decatur, Illinois <br /> Hanson No. 08L0198 <br /> Mr. Newell: <br /> We have reviewed the bid received by the City for Hydraulic Cylinder Procurement as part of the <br /> Lake Decatur Dam repair project. We recommend that the City reject the bid received. <br /> It was discovered during the bidding process that some of the design criteria in the specifications <br /> for the replacement cylinders required performance beyond the settings for the existing hydraulic <br /> system. The primary issue was the specification of 5,000 psi design pressure for the cylinders, <br /> while the existing cylinders currently operate at a working pressure of 500 psi. <br /> It is our understanding that some of the potential bidders were unable to meet the design criteria <br /> and unable to bid. The bid received from Douce-Hydro is approximately $100,000 more than <br /> the City's estimate for the cylinder procurement. We recommend that the specifications be <br /> modified for the proper working pressure and that cylinder procurement be included in the <br /> specifications for the upcoming bid documents for the spillway structure repairs. <br /> We regret any inconvenience experienced by the City caused by these issues during the bidding <br /> process. <br /> Sincerely, <br /> HANSON PROFESSIONAL SERVICES 1NC. <br /> �2� <br /> / <br /> Jeffr . Tatarek, P.E., S.E. <br /> Project Manager <br /> . <br /> �Pnnted on recycled paper using agri-based inks <br /> I:\08'obs\08L0198�Admin\06-Corres ondence�I.091120 Newell.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.