My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2009-215 APPROVING EXPENDITURE
COD
>
City Clerk
>
RESOLUTIONS
>
2009
>
R2009-215 APPROVING EXPENDITURE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2015 4:16:52 PM
Creation date
10/12/2015 4:16:51 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2009-215
Res Ord Title
APPROVING EXPENDITURE EMERGENCY WATER MAIN REPAIR LINCOLN PARK DRIVE
Department
Water
Approved Date
11/2/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF WATER MANAGEMENT <br /> Memorandum No. 2009-22 <br /> October 28, 2009 <br /> TO: Honorable Mayor McElroy and City Cpuncil <br /> �� <br /> FROM: Ryan P. McCrady, City Manager � A <br /> Keith D. Alexander, Director of Water Management �j.�- <br /> �l \ <br /> SUBJECT: Emergency Water Main Repair on Lincoln Park Drive <br /> SUMMARY RECOMMENDATION: <br /> Council approve the attached resolution approving an expenditure of $5,220.00 with Entler <br /> Excavating Co. for an emergency water main repair on Lincoln Park Drive downstream of the <br /> Lake Decatur dam near the Illinois Central Railroad Bridge. <br /> BACKGROUND: II� <br /> On June 30, 2009, City staff became aware of an 18" diameter water main failure on Lincoln <br /> Park Drive downstream of the Lake Decatur dam near the Illinois Central Railroad Bridge. The <br /> main is a critical part of the water distribution system and is approximately 12' deep. This <br /> required major excavation and shoring to repair the pipe, which was beyond the scope of work <br /> normally performed by City staff due to the additional equipment required for an excavation of <br /> this depth. Emergency repairs were authorized by City staff to Entler Excavating Co., a reliable <br /> and experienced local contractor that was available at the time to perform the work, which began <br /> on July 1. The main was back in service on July 2 with all repairs completed by July 3. A copy <br /> of the invoice,which was not delivered to the City until recently, is attached. <br /> POTENTIAL OBJECTION: <br /> There are no known obj ections to this request. <br /> INPUT FROM OTHER SOURCES: <br /> Department of Public Works, Engineering Division. <br /> STAFF REFERENCE: <br /> Keith Alexander, Director of Water Management, 424-2863 or kalexander(a�decaturil.gov <br /> Randy Miller, Water Services Manager, 875-5704 or rmiller(�a,decaturil.gov <br /> BUDGET/TIME IMPLICATIONS: <br /> The expenditure for this work is $5,220.00 and is currently allocated in the Water Operating <br /> Fund. <br /> Attach: 2 <br /> cc: Randy Miller, Water Services Manager <br /> Matthew C. Newell, P.E., City Engineer <br /> Bob Davidson, Engineering Technician Supervisor <br /> Entler Excavating Co. <br />
The URL can be used to link to this page
Your browser does not support the video tag.