Laserfiche WebLink
Project Name: M L King Water Main <br /> Engineer's Estimate Atlas Excavating,Inc. Burdick Plumbing& Fischer Excavating,Inc. <br /> Project Number: 03-23 4740 Swisher Road Heating Co.,Inc. 1567 Heine Road <br /> Building A 728 South Main Street Freeport,IL 61032 <br /> City Engineering Division West Lafayette,IN 47906 Decatur,IL 62521 <br /> Bid Date: TUESDAY,SEPTEMBER 29,2009 <br /> Time: 11:30 A.M. <br /> Fund: WATER NON-LAKE CAPITAL <br /> Organization Code: 81808118 <br /> Object Code: 497500 <br /> Item Pa Item <br /> Number y QTY Unit Unit Price Total Unit Price Total Unit Price Total Unit Price Total <br /> 71 remove and replace li htin ,fla poles,etc at SWTP,LS 1 LS 9,000 $9,000.0 $2,000.00 $2,000.00 $10,000.00 $10,000.00 $5,335.20 $5,335.20 <br /> 72 remove 8 replace a re ate base or surface course,Ty A,8",SY 3,600 SY 14 $50,400.0 $8.00 $28,800.00 $12.00 $43,200.00 $10.91 $39,276.0 <br /> 73 remove&replace PCC pavement, 9",SQ YD 4,200 SY 70 $294,000.00 $50.00 $210,000.00 $68.00 $285,600.00 $67.14 $281,988.00 <br /> 74 remove&replace PCC pavement 11",SQ YD 10,320 SY 80 $825,600.00 $52.00 $536,640.00 $71.00 $732,720.00 $72.43 $747,477.60 <br /> 75 bituminous material primer,GAL 3,000 GAL 6 $18,000.0 $5.00 $15,000.00 $6.60 $19,800.0 $6.50 $19,500.00 <br /> 76 Hot mix asphalt surface course Mix C, N50,TN 2,380 TON 120 $285,600.0 $99.00 $235,620.00 $124.00 $295,120.0 $99.00 $235,620.00 <br /> 77 remove 8�replace PCC Drive,6",SQ YD 70 SY 70 $4,900.00 $48.00 $3,360.00 $57.00 $3,990.0 $115.59 $8,091.30 <br /> 78 remove&replace PCC sidewalk,4",SQ FT 2,575 SF 8 $20,600.00 $5.75 $14,806.25 $8.00 $20,600.00 $10.72 $27,604.00 <br /> 79 remove&replace concrete median surface,4",SQ FT 205 SF 8 $1,640.00 $5.50 $1,127.50 $8.00 $1,640.00 $16.62 $3,407.10 <br /> 80 remove 8 replace curb 8 utter,6"barrier,FT 1,645 LF 30 $49,350.0 $45.00 $74,025.0 $49.00 $80,605.00 $27.16 $44,678.20 <br /> 81 remove&replace curb 8 utter,9"barrier,FT 40 LF 35 $1,400.0 $56.00 $2,240.00 $67.00 $2,680.00 $42.48 $1,699.20 <br /> 82 remove&replace curb&gutter,B-6.12,FT 920 LF 35 $32,200.00 $40.00 $36,800.00 $42.00 $38,640.00 $26.94 $24,784.8 <br /> 83 remove&replace curb&gutter,B-6.18,FT 20 LF 40 $800.00 $50.00 $1,000.00 $59.00 $1,180.0 $6729 $1,345.8 <br /> 84 8"DIP sewer w/C-905 DR-18 casin pipe 95 LF 200 $19,000.00 $100.00 $9,500.00 $100.00 $9,500.0 $182.95 $17,380.25 <br /> 85 sanitary sewer replacement,C-900,DR-18,8"FT 22 LF 70 $1,540.0 $75.00 $1,650.00 $42.00 $924.00 $179.10 $3,940.2 <br /> 86 sanitary sewer replacement,C-900,DR-18,10"FT 22 LF 80 $1,760.00 $75.00 $1,650.00 $45.00 $990.00 $187.39 $4,122.5 <br /> 87 sanita sewer replacement,C-900,DR-18,12"FT LF 90 $3,960.00 $75.00 $3,300.0 $45.00 $1,980.0 $166.55 $7,328.20 <br /> 88 storm sewer replacement,C-900 DR-18,4"FT 40 LF 40 $1,600.0 $75.00 $3,000.00 $28.00 $1,120.0 $141.27 $5,650.80 <br /> 89 storm sewer replacement,C-900 DR-18,6"FT 5 LF 50 $2,850.0 $75.00 $4,275.00 $32.00 $1,824.00 $144.39 $8,230.2 <br /> 90 storm sewer re lacement,C-900 DR-18,8"FT 8 LF 60 $4,980.0 $60.00 $4,980.00 $36.00 $2,988.00 $148.66 $12,338.7 <br /> 91 storm sewer re lacement,C-900 DR-18, 10"FT 220 LF 80 $17,600.0 $60.00 $13,200.00 $38.00 $8,360.00 $155.52 $34,214.4 <br /> 92 storm sewer replacement,C-900 DR-18,12"FT 661 LF 90 $59,490.0 $65.00 $42,965.00 $39.00 $25,779.0 $184.31 $121,828.91 <br /> 93 storm sewer replacement,C-905 DR-18,18"FT 22 LF 100 $2,200.0 $75.00 $1,650.00 $160.00 $3,520.0 $229.24 $5,043.2 <br /> 94 ater main lowerin ,6"LS 1 LS 25,000 $25,000.0 $4,000.00 $4,000.00 $8,000.00 $8,000.00 $5,354.65 $5,354.65 <br /> 95 trench backfill,CU YD 19,620 CY 40 $784,800.0 $0.10 $1,962.00 $25.00 $490,500.0 $27.68 $543,081.6 <br /> 96 Manhole A-1C,4'dia,EA 1 EA 3,500 $3,500.0 $5,000.00 $5,000.00 $4,000.00 $4,000.0 $2,258.99 $2,258.9 <br /> 97 traffic control and protection 1 LS 25,000 $25,000.0 $45,000.00 $45,000.00 $98,600.00 $98,600.0 $125,496.62 $125,496.62 <br /> 98 erosion control 1 LS 10,000 $10,000.0 $15,000.00 $15,000.0 $3,000.00 $3,000.00 $10,000.00 $10,000.00 <br /> 99 electrical work at the SWTP,LS 1 LS 10,000 $10,000.00 $10,144.00 $10,144.0 $6,100.00 $6,100.0 $5,071.68 $5,071.68 <br /> 100 emove and replace traffic si nal loops ML Kin &Wood St 1 LS 2,500 $2,500.00 $10,000.00 $10,000.00 $2,890.00 $2,890.00 $4,136.40 $4,136.40 <br /> 101 remove and replace traffic si nal loops ML Kin &Prairie St 1 LS 2,500 $2,500.00 $5,000.00 $5,000.00 $4,640.00 $4,640.00 $5,322.24 $5,322.2 <br /> 102 remove and replace traffic si nal loops ML Kin &Eldorado St 1 LS 2,500 $2,500.00 $4,000.00 $4,000.0 $2,890.00 $2,890.0 $4,136.40 $4,136.40 <br /> 103 remove and replace traffic si nal loops ML Kin &Grand Ave. 1 LS 2,500 $2,500.00 $5,000.00 $5,000.00 $3,780.00 $3,780.0 $4,663.44 $4,663. <br /> 104 remove and replace tra�c signal loops ML Kin &Garfield Ave. 1 LS 2,500 $2,500.00 $5,500.00 $5,500.00 $5,625.00 $5,625.00 $5,441.04 $5,441.0 <br /> 105 42"x 6"x 42"tee 1 EA 15,000 $15,000.00 $18,000.00 $18,000.00 $17,000.00 $17,000.00 $21,509.86 $21,509.86 <br /> Page 3 of 4 <br />