Laserfiche WebLink
Amendment No. 3 to <br /> Agreement C08L0198 <br /> Whereas, the City of Decatur, subsequently referred to as "Client,"and Hanson Professional Services Inc., <br /> subsequently referred to as "Hanson,"have previously entered into a Professional Services Agreement dated <br /> December 29, 2008 in connection with the Lake Decatur Dam Repairs subsequently referred to as "Project,"and <br /> Whereas, the Client has ordered certain changes to the services being provided by Hanson for the Project. <br /> Now,therefore, this Amendment to the Agreement(Amendment No. 3) is made this 17th day of September, <br /> 2009 to revise the Scope of Services and Cost of Services as provided herein. All other terms and conditions of <br /> the Agreement remain unchanged. <br /> The Scope of Services is modified as follows: <br /> l. Annual Escalation of Rates: <br /> a. Contract Amendment No. 2 is for construction services which were planned for 2009. Due to the <br /> lack of bids during the initial advertisement period, these services were postponed. The project <br /> will be re-bid in January 2010, with construction anticipated for that year. Therefore the amount <br /> of compensation for construction services in Amendment No. 2 is increased to account for the <br /> anticipated escalation of wage rate schedules. <br /> b. The 2010 wage rate schedules have not been finalized at this time. A 2010 wage rate schedule <br /> for Hanson, and our subconsultants, will be provided to the City when it becomes available. <br /> 2. Hydraulic Cylinder Installation: <br /> a. It is our understanding that the City of Decatur will procure a total of eight hydraulic cylinders <br /> designed to replace the existing cylinders which operate the two bascule gates on the dam. The <br /> following additional services will be provided related to the cylinder installation: <br /> i. Review of Contractor's submittals. <br /> ii. Telephone and written correspondence to support response to Contractor's Request for <br /> Information(RFI) during fabrication, testing and installation. <br /> iii. Pre-production meetings and manufacturer's shop visits to observe hydraulic cylinder <br /> testing required by the specifications. <br /> iv. Field observations during installation and functional testing of the hydraulic cylinders. <br /> 3. Revise Plans, Specifications and Estimates: <br /> a. In order to prepare bidding documents to reflect the scope of work for cylinder installation and <br /> revised bidding information, the following additional services will be provided: <br /> i. Revise bidding documents to reflect the change in bid dates. <br /> ii. Review status of existing environmental permits. <br /> iii. Update and expand list of plan room locations in order to provide a wider range of <br /> contractor's the opportunity to bid on the project. <br /> PSA A�GI I Iefll�Cv.�S Paper using agri-based inks <br /> 1 <br /> _ <br />