Laserfiche WebLink
, _� � i <br /> � I <br /> STRAN� <br /> ASSOCIATES. INC` <br /> E N G I N E E R S <br /> Task Order No. 09-04 <br /> 9t0 West Wingra Drive City of Decatur, Illinois (OWNER) <br /> Madison,WI 53715 and Strand Associates, Inc. (ENGINEER) <br /> Phone:608-251-4843 Pursuant to Technical Services Agreement Dated March 30, 2009 <br /> Fax:608-251-8655 <br /> �ce Locations <br /> Project Information <br /> Madison,WI <br /> Joliet,IL <br /> Louisville,KY Project Name: William Street Pump Station Motor Control Center (MCC) Replacement <br /> Lexington,KY <br /> Mobile,,a� Services Description: Design, Bidding-Related, and Construction-Related services will <br /> Columbus,IN <br /> Columbus,oH consist of preparing final drawings and technical specifications to replace the existing MCC <br /> Indianapolis,IN at William Street Pump Station as well as assistance during bidding and construction. <br /> Milwaukee,WI <br /> Cincinnati,OH <br />' Pnce��X,nz Scope of Services <br /> The following services will be provided by ENGINEER to OWNER: <br /> www.strand.com <br /> Design and Bidding-Related Services <br /> 1. Prepare draft drawings and specifications for OWNER review. <br /> 2. Review draft drawings and specifications with OWNER and incorporate OWNER <br /> comments. <br /> 3. Prepare ENGINEER's opinion of probable construction cost. <br /> 4. Prepare up to fifteen copies of bidding documents for distribution to prospective <br /> contractars and suppliers. <br /> 5. Prepare addenda and answer questions during bidding. <br /> 6. Assist OWNER in the tabulation and analysis of bid results and award of the <br /> Construction Contract. <br /> 7. Prepare three sets of Contract Documents for signatures. <br /> Construction-Related Services <br /> 1. Review contractor's shop drawings. <br /> 2. Communicate clarifications and interpretations to contractor with copy of <br /> correspondence to OWNER. <br /> 3. Prepare contract change orders for execution by OWNER or field orders for adjustments <br /> not requiring extra time or costs. <br /> 4. Provide list of construction issues and List of Items to be Completed or Corrected at the <br /> time of substantial completion (one site visit). <br /> 5. Assist OWNER and contractor with final inspection for the acceptance of work(one site <br /> visit). <br />