Laserfiche WebLink
� � <br /> Public Works Memorandum <br /> No. 2009 - 68 <br /> DATE: August 10, 2009 <br /> TO: Honorable Mayor McElroy and City C uncil <br /> FROM: Ryan P. McCrady, City Manager � � ` <br /> Richard G. Marley, Director of Public Works ( C-� � <br /> I <br /> SUBJECT: Emergency Repair McKinley Avenue Culvert <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staffthat the City Council approve the attached resolution approving the <br /> expenditure of$27,983 for the emergency replacement of a collapsed culvert north of <br /> McKinley Avenue at Graceland Avenue, and that the Mayor be authorized to sign said <br /> resolution, and the City Clerk to attest. <br /> BACKGROUND: <br /> A large 5' wide by 4.5' tall arched concrete culvert that lays north of McKinley Avenue at the <br /> intersection of McKinley Avenue and Graceland Avenue has experienced structural damage. <br /> In January 2008, the Sanitary District of Decatur informed the City of Decatur that the <br /> downstream end of the McKinley Culvert had developed a large hole in the invert (floor)of the <br /> pipe. At the time this was found, the rest of the culvert was in good structural shape. The City <br /> included a repair to the culvert in the 2008 Various Storm Sewer Improvements Project that <br /> was advertised, bid and awarded to Barr& Robison Sewer and Excavating, Inc., in Spring <br /> 2009. <br /> During the bidding process, the City found that a portion of the culvert walls had collapsed. <br /> The repair project was no longer valid and was removed from the Various Storm Sewer Repair <br /> project. The culvert outlets to a tributary of Spring Creek immediately adjacent to a combined <br /> sewer overflow station owned by the Sanitary District of Decatur. There are also several other <br /> sanitary sewers in the vicinity. <br /> The culvert runs under a vacated railroad right-of-way with a large embankment and is <br /> approximately 18' feet deep at the highest point of the embankment. If a major collapse were <br /> to occur, the movement of the embankment could undermine the integrity of the nearest <br /> sanitary sewer pipe in that area. <br /> The City contracted with Barr & Robison Sewer and Excavating, Inc. to replace the culvert <br /> through an emergency declaration, signed by City Manager McCrady on June 17, 2009. The <br /> contractor's work commenced on July 24 after delivery of the required pipe material and was <br /> completed on July 31, 2009. <br /> Page � 1 <br />