My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2009-138 AUTHORIZING A CONTRACT TIME EXTENSION
COD
>
City Clerk
>
RESOLUTIONS
>
2009
>
R2009-138 AUTHORIZING A CONTRACT TIME EXTENSION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2015 10:30:27 AM
Creation date
10/13/2015 10:30:26 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2009-138
Res Ord Title
AUTHORIZING THE EXECUTION OF A CONTRACT TIME EXTENSION FOR WATER SYSTEM IMPROVEMENTS PHASE II CONSTRUCTION CONTRACT
Department
Public Works
Approved Date
8/3/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
: ��'� [ 01 : 22 PM CHRISTY-FOLTZ (NC BLDR FAX No, 121 �4282718 P� Q02 <br /> � ' <br /> C N R 1 S T Y • F O LT Z • ! N C • B U I L b E R S <br /> 74Q S � U7H MAIN STREET . p � CAl' UR • lLLINOfS • b2525 i <br /> P. O. QQX 828 AREA CODE 217 •428�8601 <br /> June 26, 2009 <br /> Strand & Associates <br /> 9�f 0 W Wingra Drive <br /> Madison, Wl 53715 ' <br /> Attn: Shane Zenz <br /> Re: Decatur Water Treatment Plant <br /> Phase 11 <br /> Dear Shane, <br /> P[ease be advised that w� wilE request a time extenslon for the referenced praject. <br /> The extension is necessary 6ecaus�, through circumsfiances beyond our control, the <br /> deliv�ry of process equipment and controls has been c€elayed subsfiantially. We <br /> beiieve an extension of approximately 6p days will be sufficient. Once the equipment <br /> is on sita, we wilf be able to de�ermine the number of additional days needed. <br /> Sincerefy, <br /> CHRISTY�FOLTZ, 1NC. � <br /> Brian G. Blad� <br /> BGB:mw <br /> + e ,� � <br /> � I <br /> C� <br />
The URL can be used to link to this page
Your browser does not support the video tag.