My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2009-110 AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI & ASSOCIATES
COD
>
City Clerk
>
RESOLUTIONS
>
2009
>
R2009-110 AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI & ASSOCIATES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2015 11:36:51 AM
Creation date
10/13/2015 11:36:50 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2009-110
Res Ord Title
AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI & ASSOCIATES FOR CONSTRUCTION ENGINEERING AND INSPECTIONS OF THE WATER DISTRIBUTION MAIN FROM THE SWTP TO THE ELEVATED TANKS
Department
Public Works
Approved Date
7/6/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT FOR CONSTRUCTION ENGINEERING SERVICES <br /> for <br /> CITY OF DECATUR <br /> ML KING WATER MAIN <br /> L17-2553 � <br /> (�` � <br /> THIS AGREEMENT made at Decatur, Illinois, thi� day of , 2009 by and <br /> between the City of Decatur, hereinafter referred to as the "O ER" d ainbridge, Gee, <br /> Milanski & Associates, Inc., 1670 South Taylorville Road, De r, Illinoi 2521, hereinafter <br /> referred to as the "ENGINEER," WITNESSETH: <br /> The OWNER proposes to engage the ENGINEER to provide professional services for the <br /> Construction Engineering and Resident Inspection for the City of Decatur ML King Water Main <br /> hereinafter referred to as the PROJECT. <br /> This project includes new water mains from the South Water Treatment Plant to the Garfield <br /> Street and Division Street water towers. <br /> THEREFORE, in consideration of these premises and the mutual covenants of the above described <br /> PROJECT: <br /> THE ENGINEER AGREES: <br /> 1. Construction Engineerin� - Furnish services during the construction period generally <br /> comprised of the following: <br /> a. Print plans and specifications for the PROJECT required for bidding and <br /> construction purposes. <br /> b. Answer design related questions during the bidding and construction period, and <br /> provide assistance to the OWNER in receiving construction bids, analyze bids <br /> received and make recommendations of contract award. <br /> c. Consult with the OWNER and with the Contractor on interpretation of plans and <br /> specifications regarding any changes under consideration as construction proceeds. <br /> d. Provide periodical job-site inspection by the Project Engineer, or his representatives, <br /> during the construction period. <br /> e. Prepare and submit all payment estimates, change orders, records and reports <br /> required by the OWNER. <br /> f. Safeguard the OWNER against defects and deficiencies on the part of the contractor, <br /> but the ENGINEER does not guarantee the performance of the contract by the <br /> contractor. <br /> BGM 04-100C Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.